Tenderskhoj
India
- Infrastructure Bridges
LOCATION SUMMARY DEADLINE
Kerala Upgradation Of Azhankal Walkway- Hanging Bridge In Thiruvananthapuram-structural Works.
11 Jun 2024
Delhi Appointment Of Safety Consultant For construction, Operation & Maintenance Of Z-morh Tunnel Including Approaches On Srinagar Sonamarg Section Connecting National Highway No. 1 In The Ut Of J&k On Dbfot Annuity Basis.
18 Jun 2024
Uttarakhand Rfp For The Work Of Construction Of Tunnel/cavity Car Parking At Kempty Fall Mussoorie On Nh-707a (mussoorie To Chakrata) Under District Tehri Garhwal In The State Of Uttarakhand On Epc Mode
04 Jul 2024
Kerala Smart City - Upgradation Of Azhankal Walkway- Hanging Bridge In Thiruvananthapuram Civil Works.
11 Jun 2024
Punjab Scour Monitoring Of Bridge No 188 At Km 89/9 To 90/7(span 14x45.72m) On Jrc-ptkc Section In The Jurisdiction Of Aden-jrc.
Estimated Cost :1994973 INR
26 Jun 2024
India Earth Work In Embankment/cutting Including Blanketing, Construction Of Minor Bridges (box Bridges/psc Slab) Including Rub/lhs, Canal Crossings And Other Miscellaneous Works In Gajrahi-bahari Section Upto Gopad River (from Km 111.150 To 122.300) Excluding
Estimated Cost :816522635 INR
26 Jun 2024
Delhi Maintenance And Operation Of Subways, Storm Water Pumps, Fobs And Related Electrical Installation, Lt Panel Board, Dg Set And Dewatering Pumps Under Pwd South East, New Delhi.
(sh-hiring And Running Of Tractor Pto Driven Positive Displacement Rotary

Estimated Cost :2616840 INR
10 Jun 2024
Jammu & Kashmir Design, Construction, Launching And Commissioning 25mtr Span Steel Grider Bridge From Fanjila To Shuksherthang Including Other Allied Work (as Per Scope Of Work) Under Sdp
Estimated Cost :26250000 INR
25 Jun 2024
India Design, Supply, Erection, Testing & Commissioning Of 25 Kv, 50 Hz, Single Phase, Traction Overhead Equipment For Construction Of 4 Lane Road Over Bridge (rob) At Rawanfond, Madgaon In The State Of Goa.
Estimated Cost :20628714 INR
26 Jun 2024
Odisha Zonal Contract (bridge Works) Under The Jurisdiction Of Sr. Section Engineer (bridge)/cuttack-i And Cuttack-ii Of Khurda Road Division For The Period Upto 30/06/2025.
Estimated Cost :12584856 INR
26 Jun 2024