A PHP Error was encountered

Severity: Notice

Message: Undefined index: Science-%26-Technology

Filename: models/KhojModel.php

Line Number: 526

Backtrace:

File: /home/tkhojuser/html/application/models/KhojModel.php
Line: 526
Function: _error_handler

File: /home/tkhojuser/html/application/controllers/Tenders.php
Line: 318
Function: get_country_tenders_by_sector

File: /home/tkhojuser/html/index.php
Line: 315
Function: require_once

A PHP Error was encountered

Severity: Notice

Message: Undefined index: Science-%26-Technology

Filename: models/KhojModel.php

Line Number: 526

Backtrace:

File: /home/tkhojuser/html/application/models/KhojModel.php
Line: 526
Function: _error_handler

File: /home/tkhojuser/html/application/controllers/Tenders.php
Line: 326
Function: get_country_tenders_by_sector

File: /home/tkhojuser/html/index.php
Line: 315
Function: require_once

 Tenderskhoj
India
- Science %26 Technology
LOCATION SUMMARY DEADLINE
-Gas-Cutting-Nozzle-3/64"-Suitable-For-L.p.g-Gas-Make-Esab-Or-Kashmir-Or-Ador-Only-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]"> Telangana -Gas-Cutting-Nozzle-3/64"-Suitable-For-L.p.g-Gas-Make-Esab-Or-Kashmir-Or-Ador-Only-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]">Supply Of Gas Cutting Nozzle 3/64"
Gas Cutting Nozzle 3/64" Suitable For L.p.g Gas Make Esab Or Kashmir Or Ador Only [ Warranty Period: 30 Months After The Date Of Delivery ] ]

-Gas-Cutting-Nozzle-3/64"-Suitable-For-L.p.g-Gas-Make-Esab-Or-Kashmir-Or-Ador-Only-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]">30 Sep 2024
Rajasthan Ajmer Nagar Nigam Ward No. 20 41 42 50 57 58 59(43 48 49 Sc) Shop-7 (115)
Estimated Cost :9743310 INR
26 Sep 2024
Maharashtra School Painting Work.
Road Concreting Work.
Construction Of Boundary Wall.
Repairing Of Toilet.
Construction And Repairing Of Toilet For Aaravali Gram Panchayat.

Estimated Cost :154075 INR
24 Sep 2024
West Bengal Construction Of Cc Road From H/o Manindra Roy Towards Zp Roads, Part 13/176, Guabarnagar Gp, Within Falakata P.s.
Estimated Cost :330000 INR
24 Sep 2024
Rajasthan Supply Of Double Acting Hydraulic Shock
Double Acting Hydraulic Shock Absorbers For Vertical Application To Drg.no. Icf/sk-0-5-015, Item-2, Alt P/4 And Guarantee Shall Be As Per Clause 8 Of Rdso Specification C-8703(rev.3) Or Latest Issue ]

21 Oct 2024
Maharashtra Road Concreting Work.
Garden Development Work.
Development Work Of Selfi Point For Shirdi Municipal Council.

Estimated Cost :4190517 INR
25 Sep 2024
Odisha Supply Of Stainless Steel Dining Table With Fixed Chair (q3)
qty:11

30 Sep 2024
Haryana Supply Of M.s Moulding
M.s Moulding Item No.7 Drg.no Judw/mech/23-837 [ Warranty Period: 30 Months After The Dateof Delivery ] ]ms Moulding, Drawing No. - Judw/mech/23-837, Item No. 11 [ Warranty Period: 30 Months After The Date Of Delivery ] ]

03 Oct 2024
Rajasthan Yearly Rate Contract (f.y. 2024-25) For Supply Of Construction Material And All Item For Gram Panchayat Jawad (rates Based On Bsr 2024-25 (rdprd) Ps Mavli, Dist Udaipur)
Estimated Cost :4000000 INR
23 Sep 2024
Telangana Supply Of Locking Arrangement Of Isolating Cock Of Fds /fdss. As Per Drawing No M1008044.
Supply Of Locking Arrangement Of Isolating Cock Of Fds /fdss. As Per Drawing No M1008044. Note: One Sample To Be Got Approved By Consignee Before Bulk Supply.

03 Oct 2024