Tenderskhoj
India
- Infrastructure Roads and Highways
LOCATION SUMMARY DEADLINE
Karnataka Improvements To Roads And Drains In Hosahalli Colony In Ward No. 146, Hosahalli #1 Improvements To Cc Roads And Drains At Mct Quarters Area (opp. To Satellite Bus Stop) At Ward No. 148, New Guddadahalli Block No. 141 And 62 #1 Improvements To Cc Roads And
Estimated Cost :6340000 INR
15 Jun 2024
Maharashtra Construction Of Bituminous Road For Connecting Existing Factory Area To Newly Developed Pinaka Pod Production Area Near Admin Block Along With Storm Water Drain Inside Factory O. F. Bhusawal.
Estimated Cost :1623346 INR
18 Jun 2024
Uttarakhand Renewable Of Various Link Roads/motor Roads By Pc From Various Places. #* Renewable Of Motor Road By Cold Mix Bitumen By Pc. #hindi Image
15 Jun 2024
West Bengal Standarisation Of Level Crossing By Shifting Gate Barrier, Improvement Of Visibility,road Surface And Gate Lodge Standarisation At 19 Nos Level Crossings Gate Between Ada-gmo Section And 16 Nos Level Crossings Gate Between Prr-ksx-rjb, Anr-rui, Mhq-crp &
Estimated Cost :33788169 INR
18 Jun 2024
West Bengal 1) Standardisation Of Level Crossing By Shifting Gate Barrier, Improvement Of Visibility, Road Surface And Gate Lodge Standardisation At 44 Nos. Level Crossings Gate Between Bqa-msae Section In Adra Division.2) Provision Of Retaining Wall/toe Wall And Str
Estimated Cost :41741179 INR
18 Jun 2024
Uttarakhand Construction Of Two Lane Road And Two Lane Bridge. #hindi Image
15 Jun 2024
Uttar Pradesh Repair To Roads And Road Furniture Under Ge (east) Bareilly.
Estimated Cost :7650000 INR
25 Jun 2024
Rajasthan Supply Of Carrying Out Detail Design And Preparation Of Drawings Including Proof Check From Nit/iit For Construction Of Bridges, Robs And Supper Passage From Km 61 To 116 In Connection With Taranga Hill -ambaji- Abu Road New Line Project In Ajmer Division
21 Jun 2024
Uttarakhand Slip/bolder Cleaning Work By Jcb Machine From Various Roads. #hindi Image
13 Jun 2024
Assam Rfp For Balance Work For Widening / Improvement To 4 (four) Lane With Paved Shoulder Configuration Of Existing Single Lane Road From Srirampur (near Bhairiguri Village) To Kachukhana Harichara Paglagaunj (package-i) Of Srirampur - Dhubri Section Of Nh-127
03 Jun 2024