Tenderskhoj
India
- Infrastructure Airports
LOCATION SUMMARY DEADLINE
Sikkim Eoi For Prebid Tie Up For Selection Of Associate Consultant For Providing Professional Services For Independent Vetting Of Design And Drgs And Its Implementation Startegies For Upcoming Aai Proj. Of Widening Of Runway Strip At Airport Sikkim
01 Jul 2024
Karnataka Surface Dressing/ Leveling, Compacting and Strengthening of Runway Edges By Earth Filling, Rolling Drain Cleaning and Replacement of Dtgm Tapes Locator Boards and Illuminated Link Boards and Conducting Necessary Continuous Friction Tests Using Cfme on Flight Stri Ps Etc at Afs.
Estimated Cost :4000000
28 Jun 2024
Uttar Pradesh Rrs, Runway Drain, Grss Cutting to Side of Runway, Repair to South Loop Dispersal, Line Marking and Painting of Runway at Af Stn
Estimated Cost :4000000
27 Jun 2024
Karnataka Repair To Joint Filling In Tarmac And Road Marking Paint
Repair To Joint Filling In Tarmac And Road Marking Paint To Tarmac, Taxi Track Area And Inside Hanger At Aste Under Ge (af) Marathahalli.

Estimated Cost :2600000 INR
09 Jul 2024
Bihar Construction Of New Terminal Building And Other Allied Structures Phase I And Ii At Airport.
Supply Installation Testing Commission Of Illuminated National Flag On 30.50 Metre Monumental Flag Pole And 30 Metre High Mast

Estimated Cost :3071429 INR
10 Jul 2024
Karnataka Applying Polymer Modified Emulsion (pme) To All Links Of Both Runway ( 02-20, 08-26) At Afs Bidar
Estimated Cost :2500000 INR
10 Jul 2024
Bihar Construction Of New Terminal Building And Other Allied Structures Phase I And Ii At Patna Airport.
Procurement Of Hydraulic Tyre Killers Hydraulic Bollards And Boom Barriers

Estimated Cost :23120000 INR
06 Jul 2024
Maharashtra Runway Rehabilitation Scheme (rrs) Works Under Age Br-i Of Ge Af Lohegaon At 2 Wing Af Stn
Estimated Cost :1499000 INR
08 Jul 2024
Goa Grass Cutting Around Operational Area and Allied Works to Runway Taxi Track and Dispersal Etc at Ins Hansa Under Age Br I of Ge Nw Vasco.
Estimated Cost :4900000
25 Jun 2024
Bihar Construction Of New Domestic Terminal Building And Other Structures Phase I And Ii At Airport
Balance Work For Road And Drainage External Development Of Ntb At Jpni Airport

Estimated Cost :56728886 INR
08 Jul 2024