Tenderskhoj
India
- Energy & Power Non Renewable Energy
LOCATION SUMMARY DEADLINE
West Bengal Installation Of Grid Connected Roof-top Solar Photo Voltaic Modules Of 2.0(two) Mwp (50 Kwp X 40 Nos) Capacity System (ppp Mode) With The Objective Of Generating And Supplying To Division Through Developer Mode Only With Power Purchase Agreement (ppa) At
01 Jul 2024
Rajasthan Design, Engineering, Supply, Erection, Testing, And Commissioning Including Three (03) Years Comprehensive Operation & Maintenance Of 100 Mw (ac) Solar Power Project At Nawa, Didwana Rajasthan.
04 Jun 2024
Gujarat Procurement Of Hybrid (wind + Solar) Power On Long Term For Sez. #gujarati Image
15 Jun 2024
India Invited For A 1.5 Mw Ground- Mounted Solar Power Project With Grid Connectivity Under
15 Jun 2024
Bihar Empanelment Of Agencies For Design, Supply, Erection, Testing & Commissioning Including Warranty, Comprehensive Operation & Maintenance (five Years) Of Grid- Connected Rooftop Solar Power Plants Of Various Capacity Under Capex Model For An Estimated Capac
20 Jun 2024
Rajasthan Supply, Installation, Testing, Commissioning Of Solar Plant Of 200kw (roof Mounted) Including Maintenance Of 05 Year.
05 Jun 2024
Telangana Construction Of Compound Wall With Pre-stressed Pre Cast Posts And Panels All Round Solar Power Plant (stage-ii) At Rg-3 Area, Godavarikhani, , Telangana State
Estimated Cost :21507952 INR
11 Jun 2024
Telangana Construction Of Compound Wall With Pre-stressed Pre Cast Posts And Panels All Round Solar Power Plant (stage-ii) At Rg-i Area, Godavarikhani, Telangana State
Estimated Cost :7828146 INR
11 Jun 2024
Andhra Pradesh Supply Of Grid Connected Rooftop Solar Pv Power Plant Including All Associated Equipment Facilities As Per Technical Specification Considering Each 20kwp Inverters, Three Phase Net Meter As Per State Utility Policy For Grid Connectivity As Per Technical S
17 Jun 2024
Chhattisgarh Supply Installation Testing Contract Smps Based, Float Cum Boost Charger24v Dc, 815amp Rating For Vstpp Unit 9 And 10
17 Jun 2024