Tenderskhoj
India
- Energy & Power Non Renewable Energy
LOCATION SUMMARY DEADLINE
Delhi Selection Of Solar Power Developers For Setting Up Of 1200 Mw From Ists-connected Solar Power Projects With 600 Mw/2400 Mwh Energy Storage Systems (ess) Anywhere In India Under Tariff-based.
25 Oct 2024
Karnataka Supply Installation Testing Commissioning & Maintenance Of On-grid Solar Rooftop Power Plants Of Capacity 25kwp In Bank’s Own Building At Sbi Malleshwaram Branch (7080) In Karnataka State
03 Oct 2024
Maharashtra Hiring Of Project Management Consultant For 1352 Mw Solar Power Projects (102 Nos.) Under Mskvy 2.0 (pm Kusum Component-c) In The State Of Maharashtra.
11 Oct 2024
Maharashtra Survey, Design, Fabrication, Supply, Installation, Testing, Commissioning And Operation & Maintenance For A Period Of 5 Years Of Total 1095 Kw Distributed Capacity Of Ground/roof-top Grid Connected Solar Pv Power Plant With Net Metering At 32 Police Stati
26 Sep 2024
West Bengal Niet-05/kgp/2024-25/01
Nstallation Of On-grid Roof Top Solar Power Plant For Electrification At Khidirpur Gp Office(activity Code -40263592/2023-24)-5thsfc Tied

Estimated Cost :350000 INR
30 Sep 2024
Andhra Pradesh Supply, Erection, Testing & Commissioning Of 2nos.220kv Ptr Bays For Augmentation Of Existing Capacity From 50mw To 150mw At 220/33kv Galiveedu Pooling Station-2 Pertaining To M/s. Apspcl In Ananthapuram Ultra Mega Solar Park(1500mw) On Turnkey Basis
Estimated Cost :122721395 INR
04 Oct 2024
Karnataka Supply Installation Testing Commissioning & Maintenance Of On-grid Solar Rooftop Power Plants Of Capacity 25kwp In Bank’s Own Building At Sbi B H Road-shimoga Branch (40132) In Karnataka State.
03 Oct 2024
Karnataka Supply Installation Testing Commissioning & Maintenance Of On-grid Solar Rooftop Power Plants Of Capacity 25kwp In Bank’s Own Building At Sbild Mysuru(40936) In Karnataka State.
03 Oct 2024
Bihar Installation Of 500 Kwp On Grid Roof Top Solar Power Plant Under Ppp Model At The Service Buildings Of Jamalpur Locomotive Workshop On Turnkey Basis With Net-metering Facility.
10 Oct 2024
Maharashtra Supplying Installing Of Grid Solar Powar Pack To Majit Building At Bhagwati Tq Sengaon Dist Hingoli
Estimated Cost :749916 INR
27 Sep 2024