A PHP Error was encountered

Severity: Notice

Message: Undefined index: Science-%26-Technology

Filename: models/KhojModel.php

Line Number: 526

Backtrace:

File: /home/tkhojuser/html/application/models/KhojModel.php
Line: 526
Function: _error_handler

File: /home/tkhojuser/html/application/controllers/Tenders.php
Line: 318
Function: get_country_tenders_by_sector

File: /home/tkhojuser/html/index.php
Line: 315
Function: require_once

A PHP Error was encountered

Severity: Notice

Message: Undefined index: Science-%26-Technology

Filename: models/KhojModel.php

Line Number: 526

Backtrace:

File: /home/tkhojuser/html/application/models/KhojModel.php
Line: 526
Function: _error_handler

File: /home/tkhojuser/html/application/controllers/Tenders.php
Line: 326
Function: get_country_tenders_by_sector

File: /home/tkhojuser/html/index.php
Line: 315
Function: require_once

 Tenderskhoj
India
- Science %26 Technology
LOCATION SUMMARY DEADLINE
Uttar Pradesh Supply Of Fabric 410 Gms Og Wp P V Dope Dyed Rip Stop 148 Cms
qty:90080

Estimated Cost :16011720
27 Sep 2024
Uttar Pradesh Supply Of Cross Hatch Adhesion Tester.
Cross Hatch Adhesion Tester As Per Astm D 3359-b. Technical Requirements As Per Attached Annexure-1. Make- Elcometer, Tqc Sheen, Byk Or Similar. [ Warranty Period: 30 Months After The Date Of Delivery ] ]

16 Oct 2024
Maharashtra Construction Of Concret Road / Fixing Paver Block In Vasant Talkies Backside Various Areas At Prabhag No.4. Tal-bhusawal Dist-jalgaon
Estimated Cost :4211610 INR
30 Sep 2024
Chhattisgarh Construction Of Haat Bazar, Road, Culvert Or Any Other Work And Other Maintenance Work And Emergency Work In Mandi/sub Mandi Yard, Mandi Areas Of Distt- Koriya
07 Oct 2024
Rajasthan Supply Of Oil Level Indicator Of Transformer
Oil Level Indicator Of Transformer To Abb Document No-hstn 420277p0015 Or Latest [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total

18 Dec 2024
Maharashtra Work Of Setting Up And Operation Of Laboratory For Testing Of Samples Obtained From Bio-toilets Fitted In Coaches Of Trains Of Mumbai Division.
Estimated Cost :33541735 INR
03 Oct 2024
Odisha Construction Of Store For Cement Lime Bleaching And Ferrous Sulphate Inside Engine Division.
14 Oct 2024
West Bengal Repair To Roof Flooring Tiling Ceiling Joinery And Misc Work At Various Locations Under Age B R Ii Of Ge Bengdubi
Estimated Cost :4500000 INR
14 Oct 2024
Himachal Pradesh Repair / Renovation Of Damages On Kathang Solang Road Km 0:00 To 12/00.
Removal Of Slips At Rd 0/00 To 9:00.

Estimated Cost :495213 INR
08 Oct 2024
Andhra Pradesh Annual Maintenance Of Split Air Conditioning Units Belongs To Svvsd Kanipakam
Estimated Cost :422780 INR
09 Oct 2024