Tenderskhoj
India
- Infrastructure Bridges
LOCATION SUMMARY DEADLINE
Uttar Pradesh Dismantling Work Of Pontoon Bridge On Chambal River Between Kainjra Ghat And Udyotgarh In Agra District And Operation Of Ferry/power Barge On Pontoon Bridge On Chambal River. Work Of Safety And Maintenance Of Pontoon During Ferry Operation.
Estimated Cost :1700000 INR
11 Jun 2024
Karnataka Construction Of Bridge On Bekkeri-morab Road In Raibag Taluka Hoa 5054 Mdr Bridge Improvement For The Year 2023-24
Estimated Cost :7977782 INR
12 Jun 2024
Uttarakhand Running, Maintenance And Collection/analysis/reporting Of Data For Hydrological/ Meteorological Stations At Helong (near Urgam Bridge) And Birahi (trt) Sites Near Steel Girder Bridge Of Vphep.
Estimated Cost :2275755 INR
05 Jul 2024
Maharashtra Construction Of Balance Work Of Rob And Pup Including Slip Road, Median, Rcc Drain, Footpath Etc. From Km 441.970 To Km443.560 At Saundad On Nh-53 In The State Of Maharashtra On Epc Mode
Estimated Cost :283400000 INR
24 Jul 2024
Maharashtra Independent Engineer Services During Operation Maintenance Period For (i) Nagpur-wainganga Bridge Section Of Nh-53 On Bot (toll) Under And (ii) Chhattisgarh-maharashtra Border - Wainganga Bridge Section Of Nh-53 On Bot Basis In Maharashtra
04 Jul 2024
Maharashtra Construction Of Major Bridges (br. 66, 72 & 78), Rob At Vasai, Vehicle Subway (br. 71), Minor Bridges (br. 79, 79a), Drain (ch: 54836 To Ch: 55336) & Earthwork In Formation (ch: 38850 To Ch: 39750 & Ch: 53300 To Ch: 55750) In The Section Between Borivali
19 Jul 2024
West Bengal Conversion Of Border Security Fencing From Phase Ii/iii To New Design Fence In West Bengal Between Bp No. 243/mp To 764/2-s (length 210.028 Km).
In Various Stretches From Bp. No. 355/2-s To 357/1-s (4.725 Km), 361/m To 365/m (6.329 Km), 385/2-s To 3

Estimated Cost :433710 INR
11 Jun 2024
West Bengal Conversion Of Border Security Fencing From Phase Ii/iii To New Design Fence In West Bengal Between Bp. No. 243/mp To 764/2-s (length 210.028 Km) Sh In Various Stretches From Bp. No. 355/2-s To 357/1-s (4.725 Km), 361/m To 365/m (6.329 Km), 385/2-s To 385/
Estimated Cost :227534 INR
11 Jun 2024
Bihar Construction Of Additional 3-lane Bridge Over River Ganga For Connection Between Buxar And Bharauli On Nh-922 In The State Of Uttar Pradesh And Bihar On Hybrid Annuity Mode (2nd Call)
Estimated Cost :4441800000
11 Jun 2024
Assam Maintance Of Bailey Bridge No 26, Paint Og Make Berger Oblique Asian, Paint White Make Berger Oblique Asian, Turpentine Oil, Paint Brush 4 Inches, Unskilled Labour, Skilled Labour - Maint Of Bailey Bridge No 26 Qty : 383
Estimated Cost :500000 INR
25 Jun 2024