Tenderskhoj
India
- Infrastructure Bridges
LOCATION SUMMARY DEADLINE
Haryana Construction Of Puliya At Vill-chandi Ka Bas G.p Matour Block Morni.
Estimated Cost :700795 INR
13 Jun 2024
Odisha (1)construction Of The Proposed Road Over Bridge(rob)span (1x60 Mtr. Bow String Girder +1x 18mtr Composite Girder) At Rly. Km 425/21-23 In Lieu Of Lc No.183 Between Brag- Mcs Stations And (2)construction Of Road Over Bridge (rob)span (1x36 Mtr. Bow String
Estimated Cost :290732719 INR
28 Jun 2024
Maharashtra A. Major Repairs To Public Fob Between Tna-airoli At Km 37/21-22. B :- Major Repairs To Public Fob Between Tna-airoli At Km 38/21-22 . C :- Major Repairs To Public Fob Between Koparkhairne At Km. 45/50-51 On Trans Harbour Line.
Estimated Cost :12064970 INR
05 Jul 2024
Maharashtra Pnvl-kjt:- Remedial Measures For Cuttings And Tunnels Including Loose Scaling And Protectio Of Cutting Face, Construction Of Catchwater Drain Above Tunnels To Prevent Leakage, Side Drain In Approach Of Cutting And Tunnel Including Desilting Rehabilitation
Estimated Cost :32690024 INR
08 Jul 2024
Maharashtra A) Kalyan - Karjat :- Rehabilitation Of Bridge No. 69/2, 68/1, 69/7, 70/1, 70/2, 71/3 On Kyn- Kjt Section. (br. No. 68/1, 69/2 By Rcc Box & Br. No. 69/7, 70/1, 70/2, & 71/3 By Rcc Pipe). B) Kalyan - Karjat :- Barrel Length Extension Of Br No. 89/2, 88/5,
Estimated Cost :62157293 INR
08 Jul 2024
Tamilnadu Doubling Of Track Between Thiruvananthapuram And Kanyakumari Stations. Doubling Of Track Between Thiruvananthapuram And Kanyakumari Stations . Proposed Reconstruction Of Rob 262 As 1 X 32200 Sq (39801 Sk) Clear Span Composite Girder & Sub-structure As Pil
Estimated Cost :149973271 INR
28 Jun 2024
Punjab Reconstruction Of Three Span Arch Type Bridge At Rd 59460 Village Heron Kalan On Bahadur Singh Wala Drain On Link Road Matti Bhikhi Dhanaula Road To Cheema Upto District Boundary Under Pmgsy-iii (batch-ii, 2023-24)
21 Jun 2024
Madhya Pradesh Construction Of High Level Bridge Across Dehaar River In Km 2/2 On Badgan-parraka Road Including Approach Road And Protection Work District .
Estimated Cost :91361000 INR
28 Jun 2024
Madhya Pradesh B.t. Renewal In Km. 25.80 Of Multai Khedi Bordehi Rd And Multiple Roads Pac Rs.745.22 Lacs First Call On Road And Bridge Sor 25.03.22 Work Period 240 Days
Estimated Cost :74522000 INR
22 Jun 2024
Punjab Earth Work In Excavation Laying , Testing , Cutting, Jointing Pipe Line Including Cost Of Specials C.i /pvc D Joints Size 3" 4" 4" & Backfilling After Repair & Other Contingent Work There Too
Estimated Cost :17000 INR
18 Jun 2024