Tenderskhoj
India
- Transportation Airports & Aviation
LOCATION SUMMARY DEADLINE
Karnataka Supply Of Heat Treatment Process Simulation (q3)
Qty : 1

25 May 2024
Andaman and Nicobar Islands (UT) Providing Earthing, Lightning Arrestor And Aviation Light For Various Bts Under Phase Ix.2 Project, N&m Andaman District. (12 Additional Sites).
05 Jun 2024
Chhattisgarh 1.replacement Of Dcp Trolley Mounted Type 25 Kg Capacity With Co2 Type 01 Kg Capacity.make-firefox, Atasee, Life Secure.2.replacement Of Mechanical Foam Trolley Mounted Type 150 Liter Capacity With Co2 Type 4.5kg Capacity.make-firefox, Atasee, Life Secure
Estimated Cost :300000 INR
12 Jun 2024
Haryana Ateli Mandi Town Annual Mtc. Works For Water Supply 1 Outsourcing Of Works/ Hiring Of Tractor With Trolley Job Work For Hiring Of Tractor Trolley For Lifting Of Raw Material Complete In All Respect Per Day Basis. /hiring Of Tractor Trolley For Liftin
Estimated Cost :17800 INR
28 May 2024
Maharashtra Group-i -work Of Design, Develop Personnel Management Software Which Includes Modification/ Up- Gradation Of Existing Fas Software And Providing Customized Lams And With Using Open-source Technology With Supply And Installation Of Linux-based Avf
12 Jun 2024
Maharashtra Repair, Maintenance Installation Of Plant/ Systems/equipments - Industry Unit; Inspection Repair High Speed Dynamic Balancing Of Rotor Of Ip Compressor Bcl407a Of Synthesis Gas Compressor Unit In Ammonia Plant At Rcf Thal Unit; Buyer Qty : 1
03 Jun 2024
Haryana Manchuri Block: Assandh Panchayat: Manchuri Dist.: Annual Mtc. Work For Water Supply 1 Outsourcing Of Works/ Development Of Tube Well Development Of Tubewell With Compressor Of 450psi /development Of Tubewell With Compressor Of 450psi / Rural Areas In Var
Estimated Cost :18432 INR
24 May 2024
Assam Supply Of Biometric Access Control System (q2).q Qty : 1
03 Jun 2024
Uttar Pradesh Supply Of Cymb Color Group Ink Cartridges For Xerox Versa Link C7125 (printer) With One Number Photoshop 2024 Software Latest Version Subscription For One Year [ Warranty Period: 30 Months After The Date Of Delivery ]
27 May 2024
Haryana Kalsi- Replacement Of Existing Old Ac/pvc Pipeline. 1 Outsourcing Of Works/ Development Of Tube Well Development Of Tubewell With Compressor Of 450psi /development Of Tubewell With Compressor Of 450psi / In T/well Kisan Basti & Shanti Nagar
Estimated Cost :50000 INR
24 May 2024