LOCATION SUMMARY DEADLINE
Gujarat Ahmedabad Jn.-sabarmati Bg - Mid Term Rehabilitation Of Various Rob On Condition Basis Under The Jurisdiction Of Senior Section Engineer (bridge) .
Estimated Cost :23132427 INR
25 Jun 2024
Maharashtra Miscellaneous Repair Works Of Station Fob In Cla-tna (excld)(main Line) Section (no. Of Fobs 26 ).
Estimated Cost :11852535 INR
26 Jun 2024
West Bengal Construction Of 06 Six No Rcc Bridges At Villages Tentultala Uttar Kalyanpur Dakhin Kalyanpur Bhuyanjibarh Ahmadpur Khidirpur Block Ramnagar Ii And Ps Ramnagar Dist Purba Medinipur Under Contai Irrigation Division.
Estimated Cost :138563745 INR
04 Jun 2024
Jharkhand Reconstruction Of Existing Major Bridge Including Bridge Approach From Km 171.246 To Km 171.774 On Ranchi Rargaon Mahulia Section From Km 114.000 To Km 277.500 Of Nh 33 In The State Of Jharkhand On Engineering Procurement And Construction Epc Mode
Estimated Cost :116200000 INR
15 Jul 2024
West Bengal Construction Of 07 Seven No Rcc Bridges In Villages
Construction Of 07 Seven No. Rcc Bridges In Villages Hatbarpatna Chattri Amdai Benachakri Maheshpur Bolkushda Uttar Silampur Block Egra I Egra Ii Patashpur I And Ps Egra Patashpur Dist Purba Under

Estimated Cost :166183262 INR
04 Jun 2024
West Bengal Supply Of Pit Type Electronic Weigh Bridges
Pit Type Electronic Weigh Bridges, Capacity-40ton (details As Per Annexure.) [ Warranty Period: 30 Months After The Date Of Delivery ]

19 Jun 2024
Haryana Maintenance Of Roads Interlocking Concrete Block Pavement 3. Providing And Laying 60 Mm Thick Isi Marked Interlocking Paver Blocks Conforming To Is 15658:2006/irc Sp 63: 2004 Of All Shapes And Colours In Design Mix Cement M 35 Over The Bed Of 25 Mm Thick
Estimated Cost :49449 INR
05 Jun 2024
Uttarakhand Construction Work Of Spawn Bridge. #hindi Image
15 Jun 2024
Uttar Pradesh Reconstruction Of Damage Vrb At Canal Km.
Estimated Cost :2265000 INR
12 Jun 2024
Uttar Pradesh Construction Of Sub Way (lhs ) In Place Of Manned Lc. No. 201 Of 2.50 M Height In Pilibhit Yard. (2) Construction Of Lhs In Place Of Manned Lc. No. 270 In Section Bc-ksj Section Under Sanction Work Of (a) Construction Of Sub Way ( Lhs ) In Place Of Manned
Estimated Cost :86028881 INR
21 Jun 2024