Tenderskhoj
India
- Transportation Railways
LOCATION SUMMARY DEADLINE
Bihar Supply Of Collar Finish Machined For Motor Coaches With Fuji Type Traction Motor To Drg.no.dmu/dpc5-0-2-503, Item-1, Alt "c". [ Warranty Period: 30 Months After The Date Of Delivery ]
05 Jul 2024
Maharashtra Air Scan Cum Demand Analysis Of Iacs In Ahp Area At Ntpc Solapur
29 Jun 2024
Uttar Pradesh Supply Of Safety Strap Complete For Forged Type Equalising Stay For Ac & Non Ac Bogies To Icf Drg. No. Icf/sk3-0-5-014, Alt. A." [ Warranty Period: 30 Months After The Date Of Delivery ]
04 Jul 2024
Punjab Supply Of 1600019814buffer Strip 22x1075pnm601spr1, 1600019941wear Resistant Rpnl 1220x1050x55mmapr, 1600019944wear Res Rubber Pnl40x40aper, 1600019970rubber Screen Decktop W55x100 Swf Apr, 1600019971rubber Screen Deckbot W44x68 Swf Apr, 1600014953bucker
02 Jul 2024
West Bengal Supply Of Service Kit Set For Hydraulic Part No. 40cc (manufactured By M/s. Vr Coatings Pvt. Ltd.) [ Warranty Period: 30 Months After The Date Of Delivery ]
15 Jul 2024
West Bengal Supply Of Primary Spring For Lhb Non-ac Coaches (outer), Colour Code As Per Design;s Letter No. Md23151 Dt. 23.11.2002 & Final Code Shade Ral 7012. Drg. No. Lg01 100, Alt. Nil & Specn No. 17.248 100 05 (amendment No. 1 Of October 2004), [ Warranty Period:
01 Aug 2024
West Bengal Supply Of 150 Litres Stainless Steel Reservoir To Rdso Drg No Cg-k4026, Alt-1 For Lhb Air Suspension Type Coaches (material To Be Stainless Steel - Aisi-304) [ Warranty Period: 30 Months After The Date Of Delivery ]
26 Jul 2024
Chhattisgarh Insitu Oxide Scale Measurement And Hardness Testing Of Boiler Pressure Parts During Overhaul At Ntpc Tanda
29 Jun 2024
Haryana Iot And Hardness Measurement In Boiler Pressure Parts During Oh At Ncps Dadri For 2024 26
29 Jun 2024
West Bengal Supply Of Riding Handle For Upper Berth Of Hamsafar Coaches, As Per Drg. No. Sk.no. Llh-42/2023. [ Warranty Period: 30 Months After The Date Of Delivery ]
22 Jul 2024