Tenderskhoj
India
- Energy, Power and Electrical
LOCATION SUMMARY DEADLINE
India Applications Are Invited From Interested Agencies For Organizing And Executing The Tea Testing Protocol. The Agency Would Work Under The Supervision Of A Committee Comprising Representatives From Constituent Associations Of Ccpa. The Scope Of Work Would I
21 May 2024
Odisha Supply, Installation Commissioning Of Pid Controller, Recorder, Otc Controller (q3) Qty : 1
06 Jun 2024
Delhi Upgradation Of Ups Power Supply In Cdc At Msib Complex At 35 Sp Marg
Estimated Cost :4560367 INR
13 May 2024
Uttar Pradesh Construction Work Related To Capacity Growth (1x5 Mva + 1x10 Mva) 33/11 Kv Power Sub Center Parsaura.
Estimated Cost :3299000 INR
15 May 2024
Delhi Running And Maintenance Of Various Electrical & Mechanical Services In The O/o Ib Eb 4 R K Puram, .#* Day To Day Maintenance Of Internal And External Ei And Operation Of 380 Kva Dg Set (cummins Make)with Amf Panel And Wtac & Split Ac
Estimated Cost :2015049 INR
13 May 2024
Uttarakhand Supply Of Armature Assy, Field Coil Assy, Drive Assy, Bearing Bush Ce, Bushing Sleeve, De Bearing, Pole Screw, Slave Cylinder, Brush Gear Assy, Armature, Field Coil Auxilary, Air Pressure Pipe, Gear Fly Wheel Ring, Assy Coupling Flange, Assy Clutch Master
28 May 2024
Jharkhand Supply Of Led Luminaire (for Flood Light) As Per Is 10322, Is 16107 (q3) Qty : 50
28 May 2024
Uttar Pradesh Supply Of 1100 Volts Grade Pvc Insulated 4 0 Sq Mm X 3 Core As Per Js28599 Rev-02 Cable Should Be Supplied In (q3) Qty : 2000
17 May 2024
Delhi Additional Work, Of Electrical Installation, Ac & Fans Etc. As Required At 3rd & 4th Floor, Kitab Mahal, Bks Marg, .#* Residual Electrical Work.
Estimated Cost :502664 INR
13 May 2024
Karnataka Supply Of C Clamps As Per Is 9181 (q4)
Qty : 110

29 May 2024