Tenderskhoj
India
- Transportation Railways
LOCATION SUMMARY DEADLINE
Tamilnadu Supply Of Side Buffer Casing (casting) For Coaches To Item 1 Of Rdso Sk.94043, Alt. 5 And To Icf Str No. Icf/md/spec.-252, Rev.0 Of Aug.`13 With Amend. No. 4 Of June 2022 [ Warranty Period: 36 Months After The Date Of Delivery ]
09 Jul 2024
Tamilnadu Supply Of Emu Wearing Plate For Side Bearer To Drg.no.emu/m-0-5-047 Item -01 Alt "e". [ Warranty Period: 30 Months After The Date Of Delivery ]
17 Jul 2024
Gujarat Supply Of Maintenance And Repair Work In The Vidyalaya – Reg.
28 Jun 2024
Maharashtra Providing Seating Arrangement At Kusthi Arakhada Under Kanheri Taluka Baramati District Pune.
Estimated Cost :2514442 INR
26 Jun 2024
West Bengal Supply Of Set Of Roof Hatch Gasket For Wap7/wag9 Locomotive Which Consist Of M16roof Hatch Assly Gasket As Per Drg. No. 1209-10.437-075 Alt-1, Qty-1 No. And M24 Roof Hatch Assly Gasket As Per Drg. No. 1209-10.437-076 Alt-1, Qty-1 No. [ Warranty Period: 30
03 Jul 2024
Rajasthan Various Patch Repair Work In Sub Division Khatkar By Annual Rate Contract Tender (year 2024-25)
Estimated Cost :5000000 INR
25 Jun 2024
West Bengal Supply Of Rubber Kit For Pantograph Comprising Of 06 Items. As Per Spec/drg No. Rdso Tc No. Rdso/2007/el/tc/0094 Rev. '0' Dt. 08.06.2007.one Number Each/set. (1) Piston Packing Ring (bucket) For Servomotor.er/kpa/el/168-sv-2b. (2) Gasket Rubber For Servom
02 Jul 2024
Gujarat Unit Rate For The Item For M&r (maintenance & Repair) Works Of Dam, Canals Or Other Structures For The Year 2024-25.
Earth Work In Embankment.
Extra Lead Charges For Transporting The Borrow Area/excavated Usable Materials For Earthen Dam Beyon

08 Jul 2024
West Bengal Appointment Of A Consulting Firm For The Study Of Size / Grade Mix Of Projected Demand Of Alloy Steel At Sail Cmo.
05 Jul 2024
Gujarat 02nos Of Temporary Electrification Works. #gujarati Image
Estimated Cost :299622 INR
19 Jun 2024