Tenderskhoj
India
- Energy & Power Non Renewable Energy
LOCATION SUMMARY DEADLINE
Punjab E Tender For Design, Supply, Installation And Commissioning Of 375 Kw Grid Connected Rooftop Solar Power Plant
27 Jun 2024
Assam Providing, Installation, Testing And Commissioning Of 25 Kwp Off Grid Solar Power Plant At 15 Bops Of 16 Bn Bsf Of Shq Silchar Under Ftr Hq Bsf Mnc.
Estimated Cost :58481055 INR
25 Jun 2024
Mizoram Providing, Installation, Testing And Commissioning Of 25 Kwp Off Grid Solar Power Plant At Bops- Rangachia, Crocodile, Chhipui, Jangnasuri, Fwd, Kamtuli, Jagnasuri, Parva, Nalabasti N Bungtlang Of 20 Bn Bsf N Bop Jarralchuri Of 163 Bn Bsf (total 10 Bo
Estimated Cost :38987370 INR
25 Jun 2024
Rajasthan Design, Engineering, Supply, Erection, Testing, And Commissioning Including Three (03) Years Comprehensive Operation & Maintenance Of 100 Mw (ac) Solar Power Project At Nawa, Didwana , Rajasthan.
25 Jun 2024
Maharashtra Expressions Of Interest To Select Consortium Partners To Commission A 23 Mw Grid-connected Solar Power Project For Western Coalfields.
21 Jun 2024
Chhattisgarh Supply Of 10kwp Rooftop On-grid Solar Plants Each At Naila(nia) , Akaltara(akt) And Ambikapur (abkp ) Stations Of Bilaspur Division On Capex Mode. Specification & Warranty Clause As Per Gem Specification Enclosed At Annexure A [ Warranty Period: 30 Months
02 Jul 2024
Maharashtra Design, Supply, Installation, Testing And Commissioning With Five Year Comprehensive Maintenance Contract Of Installation Of 500 Kw Grid Connected Roof Top Mounted Fixed Axis Solar Photovaltic Power Plant At Various Building.
Estimated Cost :31404206 INR
02 Jul 2024
Uttar Pradesh Civil Work For Increasing Capacity Of Line Reactor 2x50 To 2x63 Mvar At 400 Kv S/s Panki, Kanpur.
Estimated Cost :6015858 INR
25 Jun 2024
West Bengal E-tender For Installation Of Additional Busbar Panel For Synchronizing The Power Generated From Solar Energy With Existing System At Substation At Ballygunge Science Campus.
18 Jun 2024
Uttar Pradesh Design, Engineering, Manufacture, Supply, Construction, Erection, Testing & Commissioning Works For The Epc Package For Meja Stpp Stage-ii (3 X 800 Mw) On The Basis Of Single Point Responsibility, Completely Covering The Activities And Services In Respect
16 Jul 2024