Tenderskhoj
India
- Energy & Power Renewable Energy
LOCATION SUMMARY DEADLINE
Gujarat Requirement Of Industrial Land & Solar Energy Plant Land On Long Term Lease Or Outright Basis.
30 Jun 2024
Uttar Pradesh Supply Of Construction Material, Rod, Interlocking Hume Pipe, Solar Light, Board, Dustbin, India Mark Hand Pump Repair Parts, Tiles, Door, Sheet, Fogging Machine, Cart Etc For Village Panchayat Mathiyapaar. #hindi Image
24 Jun 2024
Uttar Pradesh Supply Of Construction Material, E-rickshaw, Cycle Rickshaw, Dustbin, Brick, Brick Roddy, Cement, Sand, Murrum, Solar Light, Street Light, Ro Plant, Highmast Light, School Bench, Handpump Rebore Material, Submersible And Water Supply Material, Pipe, Hume
20 Jun 2024
Gujarat Supply Of Solar Street Lighting System (ntpc) (q3)
Qty : 20

03 Jul 2024
Jammu & Kashmir Supply Installation Of 60 Watts Solar Street Light With Motion Sensor, Supply Installation Of 60w White Led Based Solar Street Lighting System With Motion Sensor, Supply Installation Of 60 Watts Solar Street Light With Motion Sensor Including Light Source
Estimated Cost :557000 INR
10 Jul 2024
Uttar Pradesh Supply Of Construction Material - Brick, Cement, Murrum, Fine Sand, Local Balu, Rod, Brick Gitti, Stone, Interlocking Brick, Vitrified Tiles, Street Solar Light, Emulsion Paint, Hume Pipe Etc.
Supply & Fixing Of Sodium Light & Mosquito Proof Mesh. <

24 Jun 2024
West Bengal Work Of Solar Water Atm With Ro At Basantapur Hospital.
Estimated Cost :339222 INR
26 Jun 2024
West Bengal Construction Of Boundary Wall With Protection Work Nokhair Kabarsthan Ddp181915000 And 2 Nos Solar Light And 1 Nos Mark Ii Tubewell At Brahmangram Under Pundari Gp Under Harirampur Block.
Estimated Cost :2638778 INR
03 Jul 2024
West Bengal Construction Of Boundary Wall With Protection Work Sikahar Kabarsthan Ddp192015793 And 2 Nos Solar Light And 1 Nos Mark Ii Tubewell At Kokil Under Pundari Gp Under Harirampur Block.
Estimated Cost :2918564 INR
03 Jul 2024
West Bengal Overhauling Of Turbine All Modules, Hp Module Repl., Valves, Aux. Works, Oh Of Gen., Top Bar Repl. Of Gen Stator Winding If Reqd. And Other Ass. Work Of U-5, 250mw Kwu Design, Mtps And Inst. Of Gen End Winding Vib. Monitoring Sys For U-5 6, 250mw, Mtps, D
28 Jun 2024