Tenderskhoj
India
- Energy, Power and Electrical
LOCATION SUMMARY DEADLINE
Telangana Supply Of 25 Kv, 1 Amp Dropout Fuse (dof) As Per Rdso Spec. No.eti/psi/14(1/86) Or Latest
Supply Of 25 Kv, 1 Amp Dropout Fuse (dof) As Per Rdso Spec. No.eti/psi/14(1/86) Or Latest, Make : Pec Or Similar, Note : One Sample To Be Got Approved By Consi

08 Oct 2024
Rajasthan Supply Of Terminal Block 5 Mm
Terminal Block 5 Mm To Icf Sketch No. Icf/sk/7-5-035 Col I, Suitable For Memu Motor Coach. ]

21 Oct 2024
Bihar Supply Of Plug In Type Metal To Carbon, Dc Neutral Track Relay, Aci Style Qta2,9 Ohms, 2f-1b Contact, Complete With Plug-board, Retaining Clip And Connectors Conforming As Per Brs - 939 A, Brs: 966 (appendix F2), Irs:s:34 & 60(as Applicable)
Supply

30 Sep 2024
Uttar Pradesh Supply And Installation Lt Protection Work For Tailless Unit 400/630 Kva Dtr Under Edc Mahoba (bup_plan-2024-25) On Semi-turnkey Basis
Estimated Cost :3400000 INR
25 Sep 2024
Jammu & Kashmir Supply Of Suction Hose, Discharge Hose, Tube Liquid, Assy Ac Compressor, Bracket Compressor, Assy Fan With Condenser, Assy Heating Hose, Assy Eng Pump Hose, Assy Mf Condenser, Assy Receiver, Ac Pipe
qty:12

11 Oct 2024
Uttar Pradesh Supply And Installation Ht/lt Protection Dtr Work Of Boots And Sleeves And Tailless Unit Under Edc Mahoba (bus_plan-2024-25) On Semi-turnkey Basis
Estimated Cost :7000000 INR
25 Sep 2024
Bihar Supply Of Electrically Operated Lifting Barrier Set As Per Specification No- Rdso/spn/208/2012 To Work On 24v Dc And Hand Generator Back Up With 32 Ft Long G.i Boom Each Set Each Set Consisting ,2 Nos. Of Lifting Barrier But Without Fringes , Pedestals Ea
30 Sep 2024
Delhi Supply Of Video Ip Phone, Cable, Mfm, Plotter, Printer
qty:17

01 Oct 2024
West Bengal Installation Of High Mast Light At Ilipur Ginipara Harishabha Under Sripatipur Ilipur G.p. Of Haripal Block.
Estimated Cost :148946 INR
24 Sep 2024
Odisha Supply Of Lock Slides And Accessories
Lock Slides And Accessories Set For Electric Point Machine 220 Mm Stroke (irs:s-24/2002 (amd.-1) Details As Per Attached Annexure. Make- Cg Power And Industrial Solution Limited. Note - Testing Will Be Done On-s

30 Sep 2024