Tenderskhoj
India
- Infrastructure Bridges
LOCATION SUMMARY DEADLINE
Maharashtra Construction Of Major Bridge On Mdr-36 To Manjarishendwad To State Border Mdr-37 Km.0/150 A/c Panzara River Tal.sakri Dist.dhule
Estimated Cost :29841482 INR
30 Sep 2024
Maharashtra Major Repair Of Pedestal And Replacement Of Existing Elastomeric Bearing Of 4.96 Km Elevated Viaduct For Navi Mumbai Metro Project Between Ch. 170m To Ch. 5130m On Belapur-taloja-khandeshwar Corridor Of Navi Mumbai Metro Line-1
Estimated Cost :175284588 INR
21 Oct 2024
Chhattisgarh Construction Of Foot Over Bridge (sky Walk Bridge) On Main Roads Of Raipur City In District-raipur. (balance Work)
15 Oct 2024
Himachal Pradesh Annual Repair & Maintenance Operation Of Pandranoo Section-ll In Various Road 1) Katinda Piltari Road Km 0/0 To 17/0 2) Kharshal To Dhanser 0/0 To 3/0.
Construction Of Unlined Surface Drain Berms Of Tress And Shurbs And Maintenance Of Earthen Should

Estimated Cost :436562 INR
08 Oct 2024
Chhattisgarh Construction Of Midium Bridge On Piparbhawana To Gadapali Village Road & Approach Road Total Length 106.00 M.
14 Oct 2024
Chhattisgarh Construction & Maintenance Of High Level Bridge Across Birdo Nalla At 4/4 On Bodagaon Khasgaon – Trandul Road Block Antagarh Distt Kanker (c.g.)
11 Oct 2024
Chhattisgarh Survey & Boring (double Barred) Work Proposed Of District Kabirdham In Budget Year 2024-25 At P.w.d. Bridge Sub-division Kawardha. (work Code- 6110720240008)
07 Oct 2024
Jharkhand Construction Of Approach Road, Rcc Railing, Rcc Drain, Guard Wall Etc.
Repair Of Road & Bridge Railing.
Repair And Furnishing Work In Residence & Office.

Estimated Cost :7500000 INR
01 Oct 2024
Punjab Design And Construction Of Pre Fabricated Shed Including Drainage, Pathway And Allied Works At The Defined Location Inside The Workshop In Connection With Modernization Of Northern Railway, Bridge Workshop, Cantt.
Estimated Cost :130939543 INR
16 Oct 2024
India Carrying Out Geotechnical Studies Preparation Of Gad Along With Structural Design, Drawings, And Proof Checking Of Minor, Major Bridges, Rob, Fob, Buildings Etc. In Connection With Various Projects In The Jurisdiction Of Dy/ce-iv/jp Unit Of North Western
Estimated Cost :23697164 INR
16 Oct 2024