Tenderskhoj
India
- Transportation Railways
LOCATION SUMMARY DEADLINE
Telangana Proposed Modernization Of Branch Office-ii Building At Nalgonda Under Secunderabad Division, Telanaga State
Providing Civil Works, Interior Works Modular Furniture, Supply Of Chairs, Electrical Installation, Data And Telephone Cabling, Fire Alarm Sy

Estimated Cost :7304984 INR
01 Jul 2024
Karnataka Licensing Charges For Annual Inspection Of Ibr Boiler
Estimated Cost :60000 INR
13 Jun 2024
Uttar Pradesh Supply Of Adopter "l" Type For Sand Ejector, Size 2/8"x3/8" With Ferule Type Groove At3/8" End As Per Sr.dee/trs/gzb Drg. No. 135/3-phase/2005 [ Warranty Period: 30 Months After The Date Of Delivery ]
22 Jul 2024
Uttar Pradesh Supply Of Kit Of Under Frame Items For Lslrd (31 Seater) Coach Except Front Part, Console. As Per Planning Set List No. Mp23kituframelslrd Version 0. Packing Instruction: Pi042 Ver 1.0 Including 10 Set Of All Loose Material Should Be Packed As Single Unit
16 Jul 2024
Uttar Pradesh Supply Of Silent Blok, Dako Part No. Zv60200-541 [ Warranty Period: 30 Months After The Date Of Delivery ]
25 Jun 2024
Assam Supply Of Trap Sand To Emd Part No.8269587. [ Warranty Period: 30 Months After The Date Of Delivery ]
08 Jul 2024
West Bengal Procurement Of 1 No. Hydraulic Ladder Fixed On Vehicle For Street Light Maintenance In This Ulb. As Per Specification Enlclosed In Annexure I.
04 Jul 2024
Gujarat Supply Of Hyd Motor
Hyd Motor Part No:hy916n800 Make:plasser ,sauer-danfoss [ Warranty Period: 30 Months After The Date Of Delivery ]

24 Jun 2024
Gujarat Supply Of Crown & Tail Pinion
Crown & Tail Pinion Part No- Emi-63.105 & Emi-63.106, Z-31/10.make:- Plasser Or Equivalent. [ Warranty Period: 6 Months After The Date Of Delivery ]

21 Jun 2024
Madhya Pradesh Supply Of Resilient Liner (ref.3) As Per Drawing Elw/bsl/2/wam4/72.003 Alt.8 Or Latest As Attached. [ Warranty Period: 30 Months After The Date Of Delivery ]adjusting Piece (ref 2) As Per Drawing Elw/bsl/2/wam4/72.003 Alt.8 Or Latest As Attached. [ Warran
24 Jun 2024