Tenderskhoj
India
- Telecommunications
LOCATION SUMMARY DEADLINE
Haryana Supply Of High Mast (30 Meters) Along With Its Accessories For Yamunanager, High Mast (30 Meters) Along With Its Accessories For Singrauli
qty:22

25 Sep 2024
Uttar Pradesh Annual Maintenance Of Integrated Security Surveillance System - Health Monitoring Solution For Cctv System; Comprehensive; Hardware, Software; Consumables To Be Provided By Service Provider (included In The Contract Cost); Educational; Control Room; Quart
Estimated Cost :600000 INR
25 Sep 2024
Rajasthan Supply Of Video Conferencing End Point (q2)
qty:1

25 Sep 2024
Gujarat Supply Of Gsm Gateway
Gsm Gateway Modem-gsm/4g Connectivity To Existing Pbx(telephone Exchange). Technical Specification Available In Annexure-a. [ Warranty Period: 30 Months After The Date Of Delivery ] ]

30 Sep 2024
Goa Balance Work Of Laying Of 33 Kv, 3cx400 Sq.mm Xlpe Double Circuit Underground Cable From Furtado Fuel Pump-navelim To 33/11kv Fatorda Sub Station For A Route Length Of 10.2kms Through Hdd Method Under Sub-division-ii, Fatorda, Division-iv, Margao
Estimated Cost :89063031 INR
07 Oct 2024
Uttar Pradesh 6 Gram Pannchayato Bhatpur Bharawan Pipargaav Baheria Atrauli Maghigawa Shivpuri Par Camera Sthapit Karaya Jana
Estimated Cost :53935 INR
07 Oct 2024
Uttar Pradesh Selection Of Back End Partner/ Consortium Partner For Participation In Tender No. Mm/bn/ie/t-807/2024 Dated 06.09.2024 For selection Of Independent Engineer (ie) For Amended Bharatnet Program
27 Sep 2024
Kerala Parcel Space In Slr Coach (single Compartment)
Parcel Space In Slr Coach (single Compartment).

04 Oct 2024
Gujarat Providing & Erecting Highmast, Outdoor Junction Box, Led Streetlight/flood Light, Octagonal Pole, Pole Bracket, Cables And Other Electrical Works At Phophal-l Irrigation Scheme. (dist. : Rajkot).
Estimated Cost :2990318 INR
15 Oct 2024
West Bengal Supply Of 55-inch 4k Led Smart Tv At The Chamber Of The Chairman, Kmda, Unnayan Bhavan, Salt Lake.
Supply & Fixing Of Vtpn Db, Htpn Db And Spn Db At 2nd Floor, Main Building Of Unnayan Bhavan To Make Distribution Of Power To Different Offices Conven

Estimated Cost :94690 INR
24 Oct 2024