Tenderskhoj
India
- Energy & Power Non Renewable Energy
LOCATION SUMMARY DEADLINE
Madhya Pradesh Supply Of Field Electrification (solar 5kw) Qty : 3
26 Jun 2024
West Bengal Design & Engineering, Procurement, Supply, Installation, Testing & Commissioning Of 15 Kwp Off-grid Solar Pv Power Plant Along With 5 Kva Diesel Generator Set Including 5 (five) Years Warranty /defect Liability Obligation & Non-comprehensive Maintenance,
18 Jun 2024
Pondicherry (UT) Designing, Supplying, Installation, Commissioning And Comprehensive Maintenance Of 240kwp (3kw X 80 Locations) Solar Photovoltaic Grid Connected Roof-top System At Various Buildings Of Police Department, Ut Of Puducherry
25 Jun 2024
Uttar Pradesh Epc Package For Meja Super Thermal Power Project, Stage-ii (3x800 Mw).
16 Jul 2024
Uttar Pradesh Epc Package For Meja Super Thermal Power Project Stage Ii 3x800 Mw
16 Jul 2024
Chhattisgarh Estimate For Extension Of 33 Kv Add Bay For Connectivity Of 2.56 Mwp Solar Power Plant At Vill. Mohandipath U/n Arjunda Dc.
Estimated Cost :131259 INR
25 Jun 2024
Assam Bid For - Supply Delivery On For Destinations Basis Transit Insurance Packing Forwarding Transportation Along With Installation Commissioning Of 51kwp Capacity Rooftop Solar Pv System Grid Tied At Powergrid Guwahati Office Complex Qty : 1
04 Jul 2024
Odisha Supply Of Off - Grid Solar Photovoltaic (pv) Power Plant (q3) Qty : 1
17 Jun 2024
Rajasthan Design, Engineering, Supply, Erection, Testing, And Commissioning Including Three (03) Years Comprehensive Operation & Maintenance Of 100 Mw (ac) Solar Power Project At Nawa, Didwana Kuchaman, Rajasthan.
11 Jun 2024
Madhya Pradesh Invited Bids To Select Developers To Supply 1200 Mw Of Firm And Dispatchable Power (assured Peak Power Supply) From Interstate Transmission System (ists) – Connected Renewable Energy Projects Anywhere In India On Built – Own – Operate Arrangement.
23 Jul 2024