Tenderskhoj
India
- Energy & Power Non Renewable Energy
LOCATION SUMMARY DEADLINE
Delhi Rfs For Setting Up Of 1200 Mw Ists-connected Solar Pv Power Projects In India (seci-ists-xvi).
12 Jul 2024
Telangana Construction Of Compound Wall With Pre-stressed Pre Cast Posts And Panels All Round Solar Power Plant (stage-ii) At Rg-i Area, Godavarikhani, Peddapalli Dist, Telangana State
Estimated Cost :7828146 INR
15 Jun 2024
Madhya Pradesh Design, Supply, Installation, Commissioning, Testing, Trial Run And Camc Of On Grid Synchronized Solar Power Plant Of Various Capacity At Various/different Locations/places.
13 Jun 2024
Odisha Supply Of Off - Grid Solar Photovoltaic (pv) Power Plant (q3) Qty : 3
13 Jun 2024
Madhya Pradesh Selection Of Agency For Design, Engineering, Supply, Erection, Installation, Commissioning And Testing Of Shed Mounted 400 Kw Grid Connected Solar Photovoltaic Power Plant For Compressed Biogas (cbg) Plant Along With 05 Years Of Operation And Maintenance
Estimated Cost :16610170 INR
14 Jun 2024
Rajasthan Hiring Of Consultancy Services For Tca /technical Cum Health Analysis Of 13 Nos. Wtg Pertaining To 26 Mw Wind Power Plant At Rajasthan – Eq
20 Jun 2024
Uttar Pradesh Design, Engineering, Supply, Installation, Testing And Commissioning Of Ground Mounted 71 Mwp (dc) / 52 Mw (ac) Solar Power Project.
21 Jun 2024
Madhya Pradesh Design, Supply, Installation, Commissioning, Testing, Trial Run And Camc Of On Grid Synchronized Solar Power Plant Of Various Capacity At Various/different Locations/places.
13 Jun 2024
Madhya Pradesh Design, Supply, Installation, Testing And Commissioning, Trial Run And Camc Of On Grid Synchronized Solar Power Plant Of Various Capacity At Various Different Location, Places.
13 Jun 2024
Tamilnadu Setting Up Of Rooftop Solar Plants Through Developer Mode
Estimated Cost :26176472 INR
25 Jun 2024