Tenderskhoj
India
- Industry Cement
LOCATION SUMMARY DEADLINE
West Bengal Construction Of Concrete Road With Tile Pilling From Pwd Road To Sk Kutubuddin House Via Sk Abdul Hossain House At Dakshin Baguan, Sansad-xi, Jl-107, Plot-225, 252
24 Sep 2024
Punjab Supply Of Special Bulb Screw Base For Ew Shelters, Dry Expendable Cell For Ew Eqpt, Tungsten Halogen Bulb 50w For Ew Shelters Veh, Earthing Test Meters For Ew Eqpt Shelters, Copper Twisted Flexible Wire For Ew Eqpt Shelters, Copper Twisted 3 Core Power Ca
12 Oct 2024
Maharashtra Supply Of Construction Material For The Cement Concrete Road At Gp Parsodi
25 Sep 2024
Jammu & Kashmir Supply Of Store Shelter
qty:2

11 Oct 2024
Punjab Supply Of Shaft Motor Winding For 4 X 20 Kva Ew Hat Genr, Craft Balancing Repair For 4 X 20 Kva Hat Genr, Special Mounting Pad For 4 X Genr X 4 Pads, Hat Genr Mounting Floor Repair X 4 Ew Shelters, Greasing Of Ew Genr Hat 20 Kva Shaft Rotator
qty:32

12 Oct 2024
Uttar Pradesh Improvement Of Lane By Interlocking Tiles From Kushwaha Fancy Store To Yadav Sadan At Tiwaripur In Ward 58 Under Zone 2
Estimated Cost :993792 INR
24 Sep 2024
Tamilnadu Supply Of Carbon Papers As Per Is 1551 (q4), Metric Steel Scales (v2) As Per Is 1481 (q4), Pencil Box (q4), Roller Ball Pen (v2) (q4), Fluid Correction Pen (v2) (q4), Glue Stick (v2) (q4), Permanent Paint Markers (v2) (q4), Highlighter Pen (q4), Self Adhe
30 Sep 2024
Maharashtra Construction Of Cement Concrete Road And Paving Block At.dhanora Purna Tq.chandur Bazar
Estimated Cost :1601343 INR
02 Aug 2024
Andhra Pradesh Supply Of Paint Enamel Synthetic Exterior Finishing To Is: 8662 (reaffirmed 2019), Colour Shade Golden Yellow To Isc No. 356 Of Is 5:2007 With Additional Requirement Of Icf/md/spec- 045, Issue Status 02, Rev.03 With Amendment Dt.22-04-2008. The Pigment Co
27 Sep 2024
Andhra Pradesh Supply Of '2- Component Epoxy High Build Paint Elastified (top Coat), Shade Ral 7012 Colour: Grey' Conforming To Mdts Spec. No. 094, Rev-01, Amendment Slip No.1 [item To Be Supplied In 4 Equal Proportions With A Gap Of 3 Months Each With Shelf Life From T
16 Oct 2024