Tenderskhoj
India
- Energy & Power Non Renewable Energy
LOCATION SUMMARY DEADLINE
Maharashtra Upgradation Of Civil Infrastructure Activities In Msme Technology Centre, Igtr Sh: Construction Of Hostel Building (g Plus 2), Production Cum Workshop Building (g Plus 1) And Workshop Building With Rcc Structure, Ms Trusses Re-coated G.i. Sheet Roofing, A
Estimated Cost :171268501 INR
11 Oct 2024
Gujarat Hiring Of Qualified Coordinating Agency (qca) For 35 Mw Solar Power Plant (spp) At Vadodara In Line With The Gujarat Electricity Regulatory Commission (forecasting, Scheduling, Deviation Settlement, And Related Matters Of Solar And Wind Generation Sources
Estimated Cost :407400 INR
09 Oct 2024
Gujarat Supply Of Solar Power Plant (roof Top) For Ongrid System, Single Phase (q3)
qty:1

05 Oct 2024
Gujarat Supply Of Solar Power Plant (roof Top) For Ongrid System, Single Phase (q3)
qty:1

05 Oct 2024
Gujarat Supply Of Solar Power Plant (roof Top) For Ongrid System, Single Phase (q3)
qty:1

05 Oct 2024
Andhra Pradesh Contract For The Power Quality Measurement At 20 Mw Solar Pv Plant At Ntpc Jhanor By M/s Erda.
01 Oct 2024
Gujarat Designing, Manufacturing, Supplying, And Installation Of Remote Monitoring Of Solar Generation By Data Integration Of Solar Plants At Gujarat Refinery.
Estimated Cost :1178982 INR
09 Oct 2024
West Bengal Supply And Installation Of Drinking Water Sources Running On Solar Power (5kva 2.72kw 600ah Roof Top Solar (solar Power Plant Offgrid))at Gazipur Xi. Under Ganganandapur Gp. Of Bongaon Block
Estimated Cost :358882 INR
02 Oct 2024
Bihar Supply Of Solar Power Plant (roof Top) For Ongrid System, Three Phase (q3)
qty:1

Estimated Cost :860000
16 Oct 2024
West Bengal Supply And Installation Of Drinking Water Sources Running On Solar Power (5kva 2.72kw 600ah Roof Top Solar (solar Power Plant Offgrid))at Mahatpur. Under Ganganandapur Gp. Of Bongaon Block
Estimated Cost :358882 INR
02 Oct 2024