Tenderskhoj
India
- Defence
LOCATION SUMMARY DEADLINE
Karnataka Supply Of Supply And Installation Of Integrated So [supply And Installation Of Integrated Solar Street Lights: 1. 40 Watts 2. Warranty- Minimum 2 Years For Battery And Led Light 3. Installation Type : Installation In Existing Street Lights With Suitable A
07 Oct 2024
West Bengal Renovation Up Gradation Of Non - Residential Building Jawan Barrack No-01 (168 Men Barrack ) At Stc Bsf Baikunthpur ,north Bengal
Estimated Cost :10171781 INR
01 Oct 2024
Madhya Pradesh Supply Of 1) Over Voltage Protection Unit, 2) Fuel Pressure Sensor , 3) Float Type Level Sensor Threading, 4) Genset Controller 7320 Mk Ii
Over Voltage Protection Unit As Per Koel Part No.dv0.801.37.0.sp Suitable For Leroy Somer Make For 500kva, 750

04 Oct 2024
West Bengal Construction Of Road Protection Work With Boulder Setting From T. V Pukur Paschim Side At Ranpur Sansad Vi. Jl No-123, Plot No- 385, A.a.p No - Supp /03/2024 For Fund 5th Sfc (tied)
Estimated Cost :200000 INR
01 Oct 2024
Himachal Pradesh Development Of Heliport At Palampur, Kangra, Hp. #* Approach Road 1 Km, Porta Cabin Attached With Toilet Facilities For Arrival And Departure I/c Civil Work, Fire Fighting, Fato, G.i Chain Link Fencing, Surveillance System And Other Necessary Equipments)
Estimated Cost :13678488 INR
13 Oct 2024
Delhi Supply Of Element, 531 03209 Side Cutter Lh, 4h15410000 Injector Assy, 40 303394 Liner Bearing, 445 03205 Friction Plate, 907 05700 Bearing, 61 I 61 Jcb 809 00176 Bearing Liner, 445 300580 Hand Lever, 123 04473 Gaiter Hand Braike, 40 302604 Light Rear Com
27 Sep 2024
Uttar Pradesh Supply Of Access Cont In 'a' 'b' Sect Of Mathura Mil Stn
qty:3

27 Sep 2024
Kerala Supply Of Equipments To Dental Unit At Gh Thalassery , Autoclave B Class, Physio Dispensor Fiber Optic Hand Piece Rvg Sensor With Digital Dental X Ray
15 Oct 2024
Maharashtra Supply Of Oil Vapour Sensor
qty:1

27 Sep 2024
Madhya Pradesh Regarding Presenting The Rate For The Material For The Entire Work Of Tying Firecrackers And Fireworks In
Regarding Presenting The Rate For The Material For The Entire Work Of Tying Firecrackers And Fireworks In Ravana Effigies For The Stadium Groun

01 Oct 2024