Tenderskhoj
Bulgaria
- Transportation
LOCATION SUMMARY DEADLINE
Bulgaria Implementation Of The Cmr Of The Site Improvement Of The Transport Infrastructure In The Municipality Of Lesichovo Through Reconstruction And Rehabilitation Of Streets And Sidewalk Sub-site 1: Ilia Tabakov Street, Stage 1 From Ot 60-6-7-8-10-11, Lesichovo
Estimated Cost :285028 EUR
06 Apr 2026
Bulgaria Implementation Of Cmr Of Site Improvement Of Transport Infrastructure In Lesichovo Municipality Through Reconstruction And Rehabilitation Of Streets And Sidewalk Sub-site 5: 17-ta Street, Stage 1 From O.t. 40-41-17-16, S. Kalugerovo
Estimated Cost :170212 EUR
06 Apr 2026
Bulgaria Implementation Of Cmr Of Site Improvement Of The Transport Infrastructure In The Municipality Of Lesichovo Through Reconstruction And Rehabilitation Of Streets And Sidewalk Sub-site 11: 1-va Street From O.t. 18-19-3-120, S. Starchovo
Estimated Cost :203362 EUR
06 Apr 2026
Bulgaria Reconstruction And Modernization Of Outdoor Artificial Lighting Systems On The Territory Of Slivnitsa Municipality, Under The Project: Increasing The Energy Efficiency Of Outdoor Artificial Lighting Systems On The Territory Of Slivnitsa Municipality, Thro
Estimated Cost :334700 EUR
03 Apr 2026
Bulgaria Major Repair Of Obora Street, In The Section From Ot 224 R To Ot 224 Z - Stage 1 In The Town Of Kostinbrod, Commune. Kostinbrod
Estimated Cost :230746 EUR
02 Apr 2026
Bulgaria Overhaul Of Septemvri Street In A Section Of The O.t. 224d At The Intersection With Obora Street To The O.t. 2240 In Kostinbrod
Estimated Cost :204497 EUR
02 Apr 2026
Bulgaria Public Transport Of Passengers On Bus Lines From Regional And Inter-regional Transport Schemes, According To Timetables From The Quota Of The Municipality Of Belene In 3 Separate Positions
Estimated Cost :251044 EUR
14 Apr 2026
Bulgaria Restoration Of The Project Parameters Of Pavements And Drainage Galleries To Warehouses 4 And 5, Varna East Port Terminal
Estimated Cost :250000000 EUR
20 Apr 2026
Bulgaria Restoration Of The Design Parameters Of Pavements And Drainage Galleries To Warehouses 4 And 5, Port Terminal Varna - East
Estimated Cost :2500000 EUR
20 Apr 2026
Bulgaria Provision Of Consulting Services Related To The Management Of The Project Municipality Of Borovan - Replacement And Construction Of Street Lighting In The Villages Of Malorad And Dobrolevo
Estimated Cost :3017 EUR
24 Mar 2026