Tenderskhoj
Bulgaria
- Energy, Power and Electrical
LOCATION SUMMARY DEADLINE
Bulgaria Supply Of Net Active Electrical Energy And Selection Of A Balancing Group Coordinator For The Needs Of 8 (eight) Sites Of The "military Intelligence" Service
07 Jun 2024
Bulgaria "delivery Of Net Active Electrical Energy By Contractor, Coordinator Of Standard Balancing Group For Low And Medium Voltage With Full Administration Of Information Flow With Eso And Bearing The Cost Of Imbalances For The Needs Of Iaos"
17 Jun 2024
Bulgaria Supply Of Power Transformer 40/50 Mva 110/11 Kv
17 Jun 2024
Bulgaria Supply Of Load Breakers For Low Voltage With A Lever Drive For The Needs Of Power Distribution North Of Hell
20 Jun 2024
Bulgaria "supply Of Active Electrical Energy For The Needs Of The Executive Agency "automotive Administration"
17 Jun 2024
Bulgaria Selection Of A Contractor For The Implementation Of Energy Efficiency Measures Divided Into Two Separate Items
05 Jun 2024
Bulgaria Construction And Installation Works To Increase The Energy Efficiency Of The Following Objects: Special Position No. 1: Improving Energy Efficiency And Building A Photovoltaic Installation For Own Needs In The Kindergarten Alen Mak In The Town Of Tsarevo
06 Jun 2024
Bulgaria Implementation Of Smr Of A Site: Moving Of Sr And Lv Cable Lines In Connection With The Construction Of Promishlena Street
27 May 2024
Bulgaria Supply Of Electric And Gas Modules For Voltage 110 Kv
20 Jun 2024
Bulgaria Design, Supply And Installation Of A New Drive Of Needle Shutters At Sites Of The Hydroelectric Plant
10 Jun 2024