Tenderskhoj
Bosnia and Herzegovina
- Water and Sanitation
LOCATION SUMMARY DEADLINE
Bosnia and Herzegovina Drainage And Storm Drainage
25 Jun 2024
Bosnia and Herzegovina Preparation Of Project And Technical Documentation For The Development Of The Right Bank Of The Bosna River In The Settlement Of Mulici, Visoko
08 Jul 2024
Bosnia and Herzegovina Development Of The Main Project: Parapet Wall Medenjak - Trnova On The Sana River In Sanski Most And Rehabilitation Of The Embankment On The Left Bank Of The Sana River In Sanski Most Downstream From The Karic Bridge And Its Extension In A Length Of 200 M
11 Jul 2024
Bosnia and Herzegovina Execution Of Works On The Construction Of A Part Of The Fecal Sewage System In The Village Of Visokovci In A Length Of 140m, Mz Lokvine
22 Jul 2024
Bosnia and Herzegovina Solution Of Surface Water In Mz Tulovici Neslje Mecici
26 Jun 2024
Bosnia and Herzegovina Development Of The Main Project: Renovation Of The Right Bank Of The Tinja River In Srebrenik In Tinja Donja In The Section Upstream From The Bridge Near The Nk Mladost Tinja Stadium To The Mouth Of The Stream Coming From The Nearby Forest, Regulation Of
10 Jul 2024
Bosnia and Herzegovina Development Of The Main Project: Water Protection At The Site Between The Bakšaiški And Vrkašici Bridges, Improvement Of The Left Bank Of The Una In Bihac At The Location Of Golubicko Polje, Where The Construction Of The Bihac International Airport Is Pla
12 Jul 2024
Bosnia and Herzegovina Development Of The Main Project: Arrangement Of The Bed Of The Vrbas River In Bugojno At The Location Between Location Number 3 (bridge In Vrbanja - Kucice) And Location Number 4 (kucice - Mouth Of Okašnica) In A Length Of Approx. 530 M
10 Jul 2024
Bosnia and Herzegovina Development Of The Main Project: Protection Of The Right Bank Of The Usora River In Tešnje At The Location Parallel To The "jelen" Lake And Development Of The Right Bank Of The Usora River In Tešnje In The Mrkotic Settlement Upstream Of The Lake In A Leng
09 Jul 2024
Bosnia and Herzegovina Development Of The Main Project: Arrangement Of The Bosna River Bed In Ilijaš On The Section: From The Bridge On The Highway (the Kadarici-luka Settlement Border) Upstream To The Bridge On The Local Road Towards The Settlement Of Bioca And Arrangement Of
09 Jul 2024