Tenderskhoj
Bangladesh
- Transportation Railways
LOCATION SUMMARY DEADLINE
Bangladesh At Ssae/works/lkm Section : Repair And Maintenance Of Level Crossing Gate No. Lc/1(t) (spl) And Ln/1(t) With Other Allied Works.
Estimated Cost :70000 BDT
26 Jun 2024
Bangladesh At Sitakunda (stk) Railway Station Area: Extension Of Existing Platform Shed No. 1 As Per Approved Drawing.
Estimated Cost :144000 BDT
27 Jun 2024
Bangladesh At Ssae/way/srg : Supply Of Different Sizes Oil Treated Wooden Sleeper For Regular Maintenance Of Railway Joint, Bridge, Bridge Approach, Lc Gate And Points & Crossings Under Den-2/da Jurisdiction Of Bangladesh Railway.
Estimated Cost :425000 BDT
24 Jun 2024
Bangladesh At Ssae/way/cnka : Supply Of Different Sizes Oil Treated Wooden Sleeper For Regular Maintenance Of Railway Joint, Bridge, Bridge Approach, Lc Gate And Points & Crossings Under Den-1/ctg Jurisdiction Of Bangladesh Railway.
Estimated Cost :425000 BDT
24 Jun 2024
Bangladesh At Ssae/way/ssj Section: Complete Track Renewal Of Loop Line No. 4 & 5 (length- 0.592 Km) With 75 "a" Rail (s/h) And Psc Sleeper Including Ballasting Of Line 1, 2, 3, 4 & 5 At Shaistaganj Station Yard With Other Allied Works.
Estimated Cost :375000 BDT
25 Jun 2024
Bangladesh At Ssae /works/bci Section: Raising Of Existing Platform No. 2 Of Bhairab Bazar (bci) Railway Station With Other Allied Works.
Estimated Cost :220000 BDT
20 Jun 2024
Bangladesh At Netrokona (nrq) Railway Station: Extension Of Platform Shed No. 1 As Per Approved Drawing.
Estimated Cost :150000 BDT
24 Jun 2024
Bangladesh Through Renewal Of Bridge Sleeper Of Bridge No. 281 At Jamalpur- Nandina Section, Bridge No. 294,296,299,301,305,310,311,312a,314 A,317,318,320 & 321 At Jamalpur- Tarakandi Section, Bridge No. 08, 08a,9,16,19,20,21, 23,24,25 & 31 At Jamalpur Court - Dewan
Estimated Cost :260000 BDT
12 Jun 2024
Bangladesh Supply Of 86-inch All In One Interactive Display, Multifunction Printer, Toner, And Other Necessary Accessories For Meeting, Conferencing & Training Utilities Of Training & Human Resource Offices Of Bwdb During The Year 2023-24.
Estimated Cost :70000 BDT
11 Jun 2024
Bangladesh At Cgpy Yard: Re-construction Of Damaged And Unserviceable Line No. 1 & 4 At Cgpy Down Shorting Yard By 75r (s/h) Rail And Wooden Sleeper With Other Allied Works.
Estimated Cost :440000 BDT
24 Jun 2024