Tenderskhoj
Bangladesh
- Infrastructure Bridges
LOCATION SUMMARY DEADLINE
Bangladesh I). Construction Of Lifting Slab On Existing Drain Top In Nowapara Kacha Bazar And Different Place Of Nowapara Pourashava. Ii). Construction Of Toilet Room Beside Pouro Mosque In Nowapara Pourashava.
Estimated Cost :521752 BDT
03 Jun 2024
Bangladesh Construction Of 25.30 M Long Foot Over Bridge At Ch.136+310 (bscic Bus Stand) Of Dhaka (mirpur)- Uthali-paturia- Notakhola- Khashinathpur- Bogra- Rangpur- Beldangha- Banglabanda Road (n 5) Under Sirajgonj Road Division During The Year 2023-2024.
Estimated Cost :900000 BDT
05 Jun 2024
Bangladesh Phbpidp/pir/bridge/w-02 construction Of 35.0m Long Rcc Girder Bridge On 3 No Word Niyamotpur To Rojbaharpur, Pouroshava : Pirganj, District: Rangpur.
Estimated Cost :700000 BDT
06 Jun 2024
Bangladesh Earth Work, Construction Of Rigid Pavement, Flexible Pavement (reconstruction, Widening & Strengthening), Surfacing, Drain (rcc U Drain & Brick Masonry U-drain), Rcc Box Culvert (3 Nos) & Bridge (1 Nos) And Protective Work At 1st Km To 26th Km (ch.0+000m
Estimated Cost :90000000 BDT
30 May 2024
Bangladesh (a) Wmca Office Building Repair, (b) Construction Of Rcc Box Culvert (at Ch. 0+900m). (c) Construction Of Protective Work 30m On South Side Of Wmca Office Building. (d) Documentation Of Works Of Bhoradubi Beel Sub-project (sp Id-34129) Under Upazila: Boal
Estimated Cost :100000 BDT
30 May 2024
Bangladesh Construction Of 150.00m Long Psc Girder Bridge With 144m viaduct (burirdighi Bazar End 72.00m & Bamoner Basa End 72.00m) On Burirdhigirhat- Uzr-2 Near Bamaner Chowpati Via sagorer Ghat At Ch. 1+850km Under Aditmari Upazila, District: lalmonirhat. [roa
13 Jun 2024
Bangladesh Construction Of 13.20m Long Box Culvert On Mograpara G.csabdi Bazar G.c Via Hossainpur Bazar Road At Ch. 1025m Under replacement Catagory [367042010] Under Upazila: Sonargaon, district: Narayanganj.
05 Jun 2024
Bangladesh Development Of Sadarghat Road With Drain & North Nalapara Kashem Sowdagor Bari Culvert At 30 No Ward
Estimated Cost :850000 BDT
06 Jun 2024
Bangladesh Construction Of Footover Bridge At 1) Alongkar Mor, 2) A.k Khan Mor,
Estimated Cost :1000000 BDT
06 Jun 2024
Bangladesh Construction Of Boropool Bridge Over Mohesh Khal At 26 No Ward
Estimated Cost :1300000 BDT
06 Jun 2024