Tenderskhoj
Bangladesh
- Water and Sanitation
LOCATION SUMMARY DEADLINE
Bangladesh Pedp-4-tw-476 installation Of 20 Nos100 X 38 Mm Dia. Deep Tube Well With Submersible Pump At Different Primary Schools Of Jashore District Under Pedp-4 Fy 2023-24.
Estimated Cost :85000 BDT
04 Jul 2024
Bangladesh Pedp-4-tw-477 installation Of 20 Nos100 X 38 Mm Dia. Deep Tube Well With Submersible Pump At Different Primary Schools Of Jashore District Under Pedp-4 Fy 2023-24.
Estimated Cost :80000 BDT
04 Jul 2024
Bangladesh River Bank Protective Work At The Left Bank Of Kushiyara River From Km. 71.675 To Km. 71.900 Total 0.225 Km. At Hilalnagar Of Baniyachong Upazilla In Habiganj District Under Habiganj O&m Division, Bwdb, Habiganj In Fy 2023-24.
Estimated Cost :4200000 BDT
03 Jul 2024
Bangladesh River Bank Protective Work At The Left Bank Of Kushiyara River From Km. 74.100 To Km. 74.430 Total 0.33 Km. At Markuli Bazar Of Baniyachong Upazilla In Habiganj District Under Habiganj O&m Division, Bwdb, Habiganj In Fy 2023-24.
Estimated Cost :6700000 BDT
03 Jul 2024
Bangladesh Ecrp-14 installation Of 40 (forty) Nos. Rain Water Harvesting System (rwh) With Pre Filtration Unit At Dacope-15 Nos., Koyra-5 Nos. And Paikgacha- 20 Nos., 25 (twenty Five) Nos. Shallow Tubewell (including Platform Raised) At Dacope-10 Nos., Koyra-10 Nos.
Estimated Cost :192000 BDT
01 Jul 2024
Bangladesh Ecrp-15 installation Of Water Networks (community Based Water Supply Scheme) With 100mm X 50mm Dia Tube Well And Submersible Pump At Dacope-1 & Koyra-2 Upazila Of Khulna District Under Cyclone Remal Wash Response-2024, Dphe-unicef. Fy: 2023-2024.
Estimated Cost :45000 BDT
01 Jul 2024
Bangladesh Ecrp-13 reconstruction Of 20 (twenty) Nos. Platform Of Shallow/deep Tube Wells With Hand Pump (including Repair And Raise The Platform) At Dacope Upazila- 5 Nos., Koyra Upazila- 5 Nos. And Paikgacha Upazila- 10 Nos. In Khulna District Under Cyclone Remal
Estimated Cost :12000 BDT
01 Jul 2024
Bangladesh Utmidp-kuri/fulb/wd-288 construction Of Rcc Drain At Upazila Parishad Main Gate-beside Cplpny Para From Ch: 00-128m & 205-315.00m Under Fulbari Upazila, Dristrict: Kurigram.
Estimated Cost :70000 BDT
14 Jul 2024
Bangladesh Supply, Installation And Operation Of River Information System (ris) Maturity Level D+ In Jamuna River;
18 Sep 2024
Bangladesh Individual Consultants For River Information Systems Expert (poe Member)
18 Sep 2024