Tenderskhoj
Bangladesh
- Infrastructure Roads and Highways
LOCATION SUMMARY DEADLINE
Bangladesh Repairs To Road Surface Of Level Crossing Gate No. E/108, T/111, E/115, E/117, E/118, E/124, T/125, T/126, E/129, E/130, E/137(a), T/138(a), E/142, T/147, E/151, E/154, E/155 & T/156 Including Related Other Ancillary Works Under Ssae/works/parbatipur.
Estimated Cost :230000 BDT
12 Jun 2024
Bangladesh Repairs To Road Surface Of Un-manned Lc Gate No. E/2 (k.m. 225/3-4), E/3 (k.m. 225/9-226/0), E/4 (k.m. 226/7-8), E/5 (228/2-3), E/6 (k.m. 229/4-5), E/7 (k.m. 231/2-3), T/8 (k.m. 232/3-4), E/10 (k.m. 236/9-237/0), E/11 (k.m. 239/0-1), E/14 (k.m. 243/4-5),
Estimated Cost :220000 BDT
12 Jun 2024
Bangladesh Construction Of Narail Poura Lal-mia Pukur Beautification Slop Protection & Walkway At Kalidash Tank At Mohishkhola Under Narail Pourashava, District- Narail. (ch0.00-25.00m)
Estimated Cost :115000 BDT
25 Jun 2024
Bangladesh Maintenance And Wide Extentsion Of B C Road At Beltoly Bazer Lsd Godun To Pourashava End Point Ch.00+1720m . Ward No-8 Under Dewanganj Pourashava. category : Construction Work; Repair, Maintenance And Installation Services;site Preparation Work;building
Estimated Cost :400000 BDT
27 Jun 2024
Bangladesh Establishment Of Bm Values (sob) On Bm Pillar Under Bwcsrp (component-b): Shews Project, During The Financial Year 2023-24.
Estimated Cost :450000 BDT
12 Jun 2024
Bangladesh Repairs To Road Surface With Speed Breake At Level Crossing Gate No.-t/48, E/49, E/50, T/51,,e/55, T/57, E/58, T/60, T/60(a), T/60(b), T/60(c), T/60(d), E/61(a), T/65 & E/65(a) (total=15 Nos) In Between Malanchi-santahar, Supplying Fitting, Fixing & Erect
Estimated Cost :230000 BDT
12 Jun 2024
Bangladesh Rehabilation Of B C Road And Wide Extension At Girls School More To Kalikapur Dhudu Mamber House More Ch:00+990m , Word No-03 category : Construction Work; Repair, Maintenance And Installation Services;site Preparation Work;building Demolition And Wrecki
Estimated Cost :280000 BDT
27 Jun 2024
Bangladesh Emergency Supplying Of Asphalt Materials For Routine Reparing (maintenance) Works At Different Road Of Bandarban Road Sub-division-1 Under Bandarban Road Division During The Year 2023-2024
Estimated Cost :25000 BDT
10 Jun 2024
Bangladesh Construction Of 2.70 Km Long (2 Lane ) Link Road From Bastuhara Road To Old Satkhira Road (including Road Works, Culvert, Retaining Wall, Protection Works, Plantation Etc)
Estimated Cost :11500000 BDT
24 Jun 2024
Bangladesh Construction Of Road From Gacchabil Master Para To Moradolu Govt.primary School Via Shah Nagar In Manikchari Upazila Under Chtdb, Khagrachari.(group-05).
Estimated Cost :170000 BDT
06 Jun 2024