Tenderskhoj
Bangladesh
- Water and Sanitation
LOCATION SUMMARY DEADLINE
Bangladesh Construction Of Rcc Gopat. (lot No. 1)
Estimated Cost :200000 BDT
19 Jun 2024
Bangladesh Construction Of Rcc Gopat. (lot No. 2)
Estimated Cost :200000 BDT
19 Jun 2024
Bangladesh Construction Of Rcc Drain And Ancillary Works At South Side Of Laldia Char-2, Patenga, Chattogram.
Estimated Cost :1440000 BDT
08 Jul 2024
Bangladesh Rehabilitation Of Water Hydrant Pipe Line In Between Platform No. 1 & 2 With Extension (old 819 Rft And New 1300 Rft) As Per Drawing At Lalmonirhat Railway Station All Ancillary Works.
Estimated Cost :60000 BDT
24 Jun 2024
Bangladesh Upgradation Of Water Supply System And Waste Management System Including Operations And Maintenance In Ukhiya And Teknaf
30 Jun 2025
Bangladesh Lddp/w-85 construction Of Metro Level Hygienic Slaughterhouse With Necessary Drainage System At Chattogram City Corporation
Estimated Cost :25000000 BDT
11 Jul 2024
Bangladesh Lddp/w-87 construction Of Metro Level Hygienic Slaughterhouse With Necessary Drainage System At Rajshahi City Corporation
Estimated Cost :25000000 BDT
11 Jul 2024
Bangladesh Lddp/w-86 construction Of Metro Level Hygienic Slaughterhouse With Necessary Drainage System At Khulna City Corporation
Estimated Cost :25000000 BDT
11 Jul 2024
Bangladesh Daily Repair And Maintenance(garden Railing, Hand Tube Well Repair, Septic Tank And Pit Cleaning, And Other Maintenance Works At Rajshahi Medical College Hospital)
Estimated Cost :35000 BDT
19 Jun 2024
Bangladesh Bank Protection Work Along The Right Bank Of Shrimai Khal From Km. 0.000 To Km. 0.550 (=550.00m.) And From Km. 0.000 To Km. 0.450 (=450.00m.), Sub-total=(550+450)=1000m At Rajghat Bridge (d/s) Area & From Km. 0.000 To Km. 0.500 (=500.00m.) At Rajghat Brid
Estimated Cost :3650000 BDT
04 Jul 2024