Bangladesh Udcgp-gcc-d-2 (1) Rcc Drains From Mirrer Bazar To Nondibari Road (across A Railway) (part-a) I) Construction Of Drain Of Shikderbari Road From Ch. 0+000-0+440km. Ii) Construction Of Drain Of Kosaybari Road From Ch.0+000-0+320km. Iii) Construction Of Drai
Estimated Cost :3200000 BDT
25 Jun 2024
Bangladesh Construction Of One Storied Anser Barrack, Garage, Water Supply & Underground Water Reservoir Systerm, Rain Water Reservoir System, Approach Road, Internal Road And Surface Drain Etc. At Pirganj Under Bogura-rangpur-saidpur Gas Transmission Pipeline Proje
Estimated Cost :450000 BDT
13 Jun 2024
Bangladesh Construction Of One Storied (4 Storied Foundation) Staff Dormitory Building At Pirganj Under Bogura-rangpur-saidpur Gas Transmission Pipeline Project.
Estimated Cost :300000 BDT
13 Jun 2024
Bangladesh Supply And Installation Normal & Emergency Main Service Line Including Related Electrical Works Of 150 Sq.mm 01 No, 90 Sq.mm 01 No, 70 Sq.mm 01 No, 50 Sq.mm 01 No Total 04 Nos Service Line For 07 Nos. Icu Ot North Block 3rd Floor At National Institute Of
Estimated Cost :95000 BDT
06 Jun 2024
Bangladesh Construction Of One Storied (4 Storied Foundation) Officers~ Dormitory Building At Pirganj Under Bogura-rangpur-saidpur Gas Transmission Pipeline Project.
Estimated Cost :400000 BDT
13 Jun 2024
Bangladesh Changing Plaster Inside And Outside Of Main Building & Painting, Changing Door And Window Chowkat, Providing Thai Aluminum With Grill At Window And Varanda, Floor Tiles And Wall Tiles Work At Bathrooms And Kitchen, Water Supply Line At Main Building, Sewe
Estimated Cost :1200000 BDT
30 May 2024
Bangladesh Construction Of Paura Bhaban Type B, At Matlab Paurashava, Matlab South, District : Chandpur. part A : Civil Works, Part B : Water Supply And Sanitary Works, Part C : Electrical Works, Part D : Boundary Wall Works.
Estimated Cost :1900000 BDT
26 Jun 2024
Bangladesh Repair And Maintenance Of Electrical Sub-station And Board Campus Building No. 03 (08-storied) Of Secondary And Higher Secondary Education Board, Dhaka With Related Electrical Repair And Renovation Works (financial Year: 2023-2024)
Estimated Cost :100000 BDT
02 Jun 2024
Bangladesh Modernization Work Including Installation Of Tiles On The Floor Of The Auditorium, Water Proofing Work On The Roof, Renewing Of Wall Plaster, Installation Of Thai On Door And Window At Civil Surgeon~s Office, Chattogram.
Estimated Cost :60000 BDT
03 Jun 2024
Bangladesh Installation Of False Ceiling And Acoustic Work At Civil Surgeon~s Office, Chattogram.
Estimated Cost :60000 BDT
03 Jun 2024