Tenderskhoj
Bangladesh
- Transportation Railways
LOCATION SUMMARY DEADLINE
Bangladesh The Works Consist Of Preparing Time Table,fare Chart And Instruction Board For Various Stations Of Paksey Division And Installing Them To Nominated Stations.
Estimated Cost :52000 BDT
06 Jun 2024
Bangladesh At Cgd - Thorough Reapairs To Tx Type Quarter No. 211- B, 213-a, 219-b, 220-a, 221-a Total 5 Units Including With Other Allied Works Located At North Port Colony Rail Side Road No. 7/1 Including Roof Treatment And Other Allied Works.
Estimated Cost :50000 BDT
06 Jun 2024
Bangladesh At Kamalapur Railway Station, Dhaka: Finishing Of Platform No. 06 & 07 With Paver Brick And Other Related Work At Kamalapur Station, Dhaka.
Estimated Cost :600000 BDT
20 Jun 2024
Bangladesh Supply Of 60000 Nos. New Bg High Viscosity Insulating Linner For 90a Rail At Ssae/way/rajshahi Office Godown For Regular Maintenance Of Railway Track Under Divisional Engineer-1, Paksey~s Jurisdiction.
Estimated Cost :150000 BDT
24 Jun 2024
Bangladesh Supply Of 70000 Nos. New Bg High Viscosity Insulating Linner For 90a Rail At Ssae/way/rajshahi Office Godown For Regular Maintenance Of Railway Track Under Divisional Engineer-2, Paksey~s Jurisdiction.
Estimated Cost :200000 BDT
24 Jun 2024
Bangladesh Through Renewal Of Rail With De-stressing, Shallow Screening, Tamping, Welding, And Repairs To Level Crossing Gate No. T/96, E/98, E/100, And E/101 At Km. 336/43 To 349/0 In Between Hili (hl) To Birampur (barp) Station Including Other Ancillary Works In S
Estimated Cost :4000000 BDT
26 Jun 2024
Bangladesh Through Renewal Of Rail With De-stressing, Shallow Screening, Tamping, Welding, And Repairs To Level Crossing Gate No. T/73, E/75, E/78, E/84, And T/88 At Km. 301/4 To 326/5 In Between Accelpur (acp) To Panchbibi (pib) Station Including Other Ancillary Wo
Estimated Cost :5500000 BDT
26 Jun 2024
Bangladesh Through Renewal Of Rail With De-stressing, Shallow Screening, Tamping, Welding, 30 Meter Shifting (pib Site) Of Points & Crossings And Repairs To Level Crossing Gate No. T/68, And E/94 At Km. 285/0-301/4 & 326/5-336/6 In Between Santahar (stu) To Accelpur
Estimated Cost :7000000 BDT
26 Jun 2024
Bangladesh Re-construction Of Dg Psc Sleeper Track On Existing Railway Alignment By S/h Dg Psc Sleeper And S/h Rail From B/1 To B/4 Total 0.927 Km Running Line At Saidpur Workshop Including Supply And Installation Of 4 Nos. Points And Crossings With Other Ancillary
Estimated Cost :750000 BDT
26 Jun 2024
Bangladesh Re-construction Of Dg Psc Sleeper Track On Existing Railway Alignment By S/h Dg Psc Sleeper And S/h Rail From P/1 To P/16 Total 0.661 Km Running Line At Saidpur Workshop Including Installation Of 16 Nos. Points And Crossings With Other Ancillary Works In
Estimated Cost :1500000 BDT
26 Jun 2024