Tenderskhoj
Bangladesh
- Infrastructure and construction
LOCATION SUMMARY DEADLINE
Bangladesh E-tender/pedp4/mym/ Hal/2023-2024/w2a-07015 construction Of Additional Class Room At Kutura Kur At Haluaghat Under Pedp4. revised Rdpp Of Pedp4 Is Under Approval Process, So Contract Agreement Cannot Be Signed Before Rdpp Approval. If Rdpp (2nd Revision)
Estimated Cost :320000 BDT
08 Jul 2024
Bangladesh Mobilization & Demobilization Of Man Machineries Equipment’s And Materials; Fabrication & Installation Of Tbs Run As Per Drawing; Radiography, Maintenance Work Of Some Parts Of Tbs Portion; Purging, Cleaning & Commissioning Of Salda Gas Field Tbs
Estimated Cost :20000 BDT
04 Jul 2024
Bangladesh Construction Of Work Shed At Dowarabazar Ferryghat Site At 27th Km Of Gobindaganj-chhatak-dowarabazar Road (z-2802) Under Road Division, Sunamganj During The Year 2023-2024.
Estimated Cost :100000 BDT
30 Jun 2024
Bangladesh Construction Of Brta Building At Diabari, Dhaka (sub-head:- External Electrification Works)
Estimated Cost :1700000 BDT
17 Jul 2024
Bangladesh Construction Of Boundary Wall & Gate Of 1.charsarat Govt. Primary School 2. Charsarath N.m Govt. Primary School .
Estimated Cost :180000 BDT
04 Jul 2024
Bangladesh Pro/nil/dim/vr/23-24/w-490 a) Improvement Of South Singhara -kalir Danga Road At Ch-00-2175m (road Part) b) Rcc Box Culvert & U- Drain 1) Construction Of 4 Nos 0.625x0.600m U-drain At Ch -307m, 638m, 885m, & 1900m 2) Construction Of 2 Nos 1.50mx1.50m Rcc
Estimated Cost :600000 BDT
22 Jul 2024
Bangladesh Ecrp-15 installation Of Water Networks (community Based Water Supply Scheme) With 100mm X 50mm Dia Tube Well And Submersible Pump At Dacope-1 & Koyra-2 Upazila Of Khulna District Under Cyclone Remal Wash Response-2024, Dphe-unicef. Fy: 2023-2024.
Estimated Cost :45000 BDT
01 Jul 2024
Bangladesh Ecrp-13 reconstruction Of 20 (twenty) Nos. Platform Of Shallow/deep Tube Wells With Hand Pump (including Repair And Raise The Platform) At Dacope Upazila- 5 Nos., Koyra Upazila- 5 Nos. And Paikgacha Upazila- 10 Nos. In Khulna District Under Cyclone Remal
Estimated Cost :12000 BDT
01 Jul 2024
Bangladesh Utmidp-kuri/fulb/wd-288 construction Of Rcc Drain At Upazila Parishad Main Gate-beside Cplpny Para From Ch: 00-128m & 205-315.00m Under Fulbari Upazila, Dristrict: Kurigram.
Estimated Cost :70000 BDT
14 Jul 2024
Bangladesh Utmidp-kuri/fulb/wr-501 improvement Of Upazila Parishad Internal Road By Bc Under Fulbari Upazila, Dristrict: Kurigram. (effective Length-570.00m)
Estimated Cost :80000 BDT
14 Jul 2024