Tenderskhoj
Bangladesh
- Water and Sanitation
LOCATION SUMMARY DEADLINE
Bangladesh Installation And Construction Of 100 X 38 Mm Dia. 50nos. Deep Tube Well With Submersible Pump At Different Primary Schools Of Barishal District.
Estimated Cost :220000 BDT
12 Jun 2024
Bangladesh Installation Of 50 Nos. Deep Tube Well With No.6 Hand Pump At Gournadi & Agailjhara Upazilas In Barishal District Under Revenue Budget Of Department Of Public Health Engineering (dphe)
Estimated Cost :88000 BDT
12 Jun 2024
Bangladesh Rwshp-wd-16 construction Of Large Piped Water Supply Scheme Including O&m By Installing 02 Nos 250mmx150mm Dia Production Tubewell With Submersible Pump, R.c.c Overhead Tank And Iron /arsenic Removal Water Treatment Plant In Sylhet District.
Estimated Cost :3250000 BDT
12 Jun 2024
Bangladesh General Repair Work Including Laying Of Tiles In The Corridor Of The Ground Floor Of The East Block And Installation Of Ss Grill In The Balconyb At Jhalokathi Deputy Commissioner~s Office
Estimated Cost :30000 BDT
10 Jun 2024
Bangladesh 1.(i)civil, Sanitary And Sewerage Work At Toilet Blocks Of Emergency Unit, All The Chambers Of The Doctors And Nurses At Ground Floor And Again Al The Words At 1st And 2nd Floor Of Panchagarh Adhunik Sodor Hospital, Panchagarh; (ii)painting And Veranda Gr
Estimated Cost :60000 BDT
12 Jun 2024
Bangladesh Construction Of New Rcc Drain And Alteration Of The Pipe Of Sewerage Line With New Inspection Pit At The Back Side Instead Of Demolishing The Old Sewerage Line And Drain In Front Of The Padma, Meghna, Jamuna Residential Quarter And Reconstruction Of Apron
Estimated Cost :68500 BDT
09 Jun 2024
Bangladesh Construction Of A 38 Mm Deep Tube Well And Sub-mersible Pump Along With Tubewell At Chowkidar Shed Along With Construction Of Drains For Dewatering The Western Side Of The Quarter Adjacent To Sagardi Staging Hut â?�at Barishal.
Estimated Cost :565000 BDT
03 Jun 2024
Bangladesh 1. Emergency Repair Of 6" & 4" Main Pipe Line Female Hostel Front, Nursing College Main Gate, Nursing Hostel South Side Of Sbmc At Barishal. 2. Installation False Ceiling Including With Sanitary Of Gallery No-1, 2 Of North & South Side Of Gf, 1st & 2nd Fl
Estimated Cost :1625000 BDT
02 Jun 2024
Bangladesh Procurement Of 200 Mm (dn200) Scada Compatible Bulk Water Meter For Dhaka Wasa.
Estimated Cost :46000000 BDT
19 Jun 2024
Bangladesh Tidal Discharge Measurement Works (full Moon, New Moon & Neep) Of 10 Kirtankhola, 42 Baleswar River, 10 Barishal Buriswar/ Payra & 18 Biskhali At 18 Barishal, 107 Pirojpur, 19 Mirjagonj & 37.5 Betagi, Discharge Measurement Stations Of Barishal Hydrology S
Estimated Cost :1370000 BDT
09 Jun 2024