Tenderskhoj
Bangladesh
- Infrastructure Bridges
LOCATION SUMMARY DEADLINE
Bangladesh Suprb/nara/replace/23-24/w-588 construction Of 13.20m Long Box Culvert On Mograpara G.c.-sabdi Bazar G.c.via Hossainpur Bazar Road At Ch-1025m Under Replacement Category[367042010]under Uapzila: Sonargaon, Dist: Narayanganj.
Estimated Cost :550000 BDT
05 Jun 2024
Bangladesh Construction Of 25.74m (ch. 1 X 24.40m) Long P.c Girder Bridge (bridge No.-11/1) At 11th K.m. (ch. 10+358.00m) Of Bandarban-rowangchari -ruma Road (z-1813) Under Bandarban Road Division During The Year 2023-2024
27 May 2024
Bangladesh Ddirwsp/manikganj/saturia/23-24/ Br-06 construction Of 14.00m Long Rcc Girder Bridge On Saturia Gc-daragram Gc Road At Ch. 3091m Under Upazila: Saturia,district : Manikagnj (salvage Cost : 4,84,921.06) (road Id 356702001)
Estimated Cost :400000 BDT
06 Jun 2024
Bangladesh Construction Of Flexible And Rigid Pavement, Including 1 Nos (6.00m Span) Rcc Box Culvert With Other Ancillary Work At Different Km Ch 0+000 M To Ch. 12+200 M Of Feni (mohammad Ali Bazar)-chagolnia-karerhat Road (z-1031) And Construction Of Flexible And R
Estimated Cost :23000000 BDT
11 Jun 2024
Bangladesh Mrridp/24/kish/itna/uzr/249 improvement Of Itna-dhonpur Gc Road By Rcc (ch.6550-9970m) And 1no 2vx4.50m*4.50m Box Culvert At Ch.7435.0m [road Id: 348332006]; Upazila: Itna, District: Kishoreganj.
Estimated Cost :2800000 BDT
12 Jun 2024
Bangladesh Cbu-100/puro-366-a remaining Work For Construction O 63.00m Long Rcc Girder Bridge On Dhaka-tangail R&h Motra Bazar Via Farid Road At Ch. 1050m (road Id: 393095051) Upazila : Basail, District: Tangail.
Estimated Cost :862000 BDT
06 Jun 2024
Bangladesh Mrridp/24/kish/itna/unr/250 improvement Of Badla Up -borsikura Hat Road By Rcc With Protection Work (ch.00-2020m) And 1no 1v*2.0m*2.0m Box Culvert At Ch.420m [road Id: 348333007]; Upazila: Itna, District: Kishoreganj. (salvage Amount: Tk. 719148.00)
Estimated Cost :2200000 BDT
12 Jun 2024
Bangladesh Repair Of Bailey Bridge At 10th Km (ch.09+236.00m, Jagannathpur Bailey Bridge ), 13th Km (ch.12+645.00m, Rajghat Bailey Bridge) Of Sunamganj-kachirgati-bishambarpur Road (z-2804) & 15th Km (ch.14+227.00m, Shalmara Bailey Bridge), 18th (ch.17+050.00m, Kokr
Estimated Cost :55000 BDT
23 May 2024
Bangladesh Replacement Of Footpath Slab, Bridge Railing And Renovation Of Bridge Railing At Different Km. Of Gouranadi-paisarhat-kotalipara-gopalganj Road (r-852) Under Barisal Road Division During The Year 2023-2024.
Estimated Cost :45000 BDT
27 May 2024
Bangladesh A Car Wash Ramp, Plaque Box Construction, Thai Doors On The Ground Floor Of The Building, Patent Stone On The Roof, And Alteration Of The Commod And Basin In The Attached Bathroom Of The Additional Directorã¢s Room At The Divisional Narcotics Control Dire
Estimated Cost :20000 BDT
23 May 2024