Tenderskhoj
Bangladesh
- Water and Sanitation
LOCATION SUMMARY DEADLINE
Bangladesh Construction Of A 38 Mm Deep Tube Well And Sub-mersible Pump Along With Tubewell At Chowkidar Shed Along With Construction Of Drains For Dewatering The Western Side Of The Quarter Adjacent To Sagardi Staging Hut â?�at Barishal.
Estimated Cost :565000 BDT
03 Jun 2024
Bangladesh 1. Emergency Repair Of 6" & 4" Main Pipe Line Female Hostel Front, Nursing College Main Gate, Nursing Hostel South Side Of Sbmc At Barishal. 2. Installation False Ceiling Including With Sanitary Of Gallery No-1, 2 Of North & South Side Of Gf, 1st & 2nd Fl
Estimated Cost :1625000 BDT
02 Jun 2024
Bangladesh Procurement Of 200 Mm (dn200) Scada Compatible Bulk Water Meter For Dhaka Wasa.
Estimated Cost :46000000 BDT
19 Jun 2024
Bangladesh Tidal Discharge Measurement Works (full Moon, New Moon & Neep) Of 10 Kirtankhola, 42 Baleswar River, 10 Barishal Buriswar/ Payra & 18 Biskhali At 18 Barishal, 107 Pirojpur, 19 Mirjagonj & 37.5 Betagi, Discharge Measurement Stations Of Barishal Hydrology S
Estimated Cost :1370000 BDT
09 Jun 2024
Bangladesh Tidal Discharge Measurement Works (full Moon & Neep) Of 83 Nabaganga ,42 Madhumoti, 41 Rupsha-pasur, 74 Mbr River At 218 Bardia, 103 Bardia, 241 -khulna 198 Haridaspur Discharge Measurement Stations Of Jashore, Khulna & Faridpur Hydrology Sub-division Und
Estimated Cost :1370000 BDT
09 Jun 2024
Bangladesh Repair, Maintenance And Connection Work~s Of 87 Nos Wl Gauge Station~s, 52 Nos Rain Gauge And 9 Nos Rain Gauge Cum Evaporation Gauge Station~s And Flood Related Data Sending Works Of 32 Nos Station~s, (different Location) At Faridpur, Barishal, Khulna & J
Estimated Cost :786000 BDT
09 Jun 2024
Bangladesh Cleaning Of Water Tank ,dust Bin Septic Tank,soak Well, Inspection Pit , Rcc Soil And Waste Water Pipe Of Different Buildings At Residential & Power Plant Area Of Barapukuria Power Plant.
Estimated Cost :500000 BDT
11 Jun 2024
Bangladesh Annual Maintenance And Operation Of Existing 08 Pump Motors (03 Pump Houses) For Supplying Water To Supreme Court Main Building, Annex Building,bijoy-71 Building, Administrative Building Nos. 2, 3 And 4 And Attorney General And Solicitor Building Located
Estimated Cost :1055000 BDT
09 Jun 2024
Bangladesh Operation Of Oily Water Treatment Plant, Sludge Handling & Cleaning Of Sludge Pond, Oily Water Treatment Plant, Drain, Oil Pump House, Lube Oil Tank Area For Fy: 2024-25
Estimated Cost :500000 BDT
06 Jun 2024
Bangladesh Works For 05 Nos Deep Tubewell Rising Line Interconnection Along With Kwsp-2 Pipe Line At Different Location In Chattogram City Under Mod-1, Chattogram Wasa, Chattogram.
Estimated Cost :484237 BDT
09 Jun 2024