Tenderskhoj
Bangladesh
- Transportation Railways
LOCATION SUMMARY DEADLINE
Bangladesh At Cgd - Thorough Reapairs To Tx Type Quarter No. 211- B, 213-a, 219-b, 220-a, 221-a Total 5 Units Including With Other Allied Works Located At North Port Colony Rail Side Road No. 7/1 Including Roof Treatment And Other Allied Works.
Estimated Cost :50000 BDT
06 Jun 2024
Bangladesh At Kamalapur Railway Station, Dhaka: Finishing Of Platform No. 06 & 07 With Paver Brick And Other Related Work At Kamalapur Station, Dhaka.
Estimated Cost :600000 BDT
20 Jun 2024
Bangladesh Supply Of 60000 Nos. New Bg High Viscosity Insulating Linner For 90a Rail At Ssae/way/rajshahi Office Godown For Regular Maintenance Of Railway Track Under Divisional Engineer-1, Paksey~s Jurisdiction.
Estimated Cost :150000 BDT
24 Jun 2024
Bangladesh Supply Of 70000 Nos. New Bg High Viscosity Insulating Linner For 90a Rail At Ssae/way/rajshahi Office Godown For Regular Maintenance Of Railway Track Under Divisional Engineer-2, Paksey~s Jurisdiction.
Estimated Cost :200000 BDT
24 Jun 2024
Bangladesh Through Renewal Of Rail With De-stressing, Shallow Screening, Tamping, Welding, And Repairs To Level Crossing Gate No. T/96, E/98, E/100, And E/101 At Km. 336/43 To 349/0 In Between Hili (hl) To Birampur (barp) Station Including Other Ancillary Works In S
Estimated Cost :4000000 BDT
26 Jun 2024
Bangladesh Through Renewal Of Rail With De-stressing, Shallow Screening, Tamping, Welding, And Repairs To Level Crossing Gate No. T/73, E/75, E/78, E/84, And T/88 At Km. 301/4 To 326/5 In Between Accelpur (acp) To Panchbibi (pib) Station Including Other Ancillary Wo
Estimated Cost :5500000 BDT
26 Jun 2024
Bangladesh Through Renewal Of Rail With De-stressing, Shallow Screening, Tamping, Welding, 30 Meter Shifting (pib Site) Of Points & Crossings And Repairs To Level Crossing Gate No. T/68, And E/94 At Km. 285/0-301/4 & 326/5-336/6 In Between Santahar (stu) To Accelpur
Estimated Cost :7000000 BDT
26 Jun 2024
Bangladesh Re-construction Of Dg Psc Sleeper Track On Existing Railway Alignment By S/h Dg Psc Sleeper And S/h Rail From B/1 To B/4 Total 0.927 Km Running Line At Saidpur Workshop Including Supply And Installation Of 4 Nos. Points And Crossings With Other Ancillary
Estimated Cost :750000 BDT
26 Jun 2024
Bangladesh Re-construction Of Dg Psc Sleeper Track On Existing Railway Alignment By S/h Dg Psc Sleeper And S/h Rail From P/1 To P/16 Total 0.661 Km Running Line At Saidpur Workshop Including Installation Of 16 Nos. Points And Crossings With Other Ancillary Works In
Estimated Cost :1500000 BDT
26 Jun 2024
Bangladesh Spot Casual Renewal Of Accident Broken Dg Psc Sleeper At Km 312/6-311/9, 309/3-310/4, Thorough Renewal Of Psc Dg Sleeper (s/h) For 90 A Rail At Km 310/5-311/9 And Re-construction Of Level Crossing Gate No. E/57 & E/58 With Psc Sleeper In Between Tangail (
Estimated Cost :500000 BDT
12 Jun 2024