Tenderskhoj
Bangladesh
- Infrastructure Roads and Highways
LOCATION SUMMARY DEADLINE
Bangladesh Improvement Of Binodpur Bazar - Khalshi Up Office Road By bc At Ch. 0.00-2480m Under Upazila: Daulatpur, District: manikganj [road Id No: 356103003] ( Salvage Cost : tk.3611840.00)
24 Jun 2024
Bangladesh Remaining Estimate Of Gopinathpur Up- Bahadurpur Bazar Road by Bc At Ch.2357-4200m Under Upazila: Harirampur, District: manikganj. [road Id No.356283009]
13 Jun 2024
Bangladesh Improvement Of Putail Up Office - Shanbhandha Bazar Road By bc From Ch.00-988m Under Upazila:sadar , District: Manikganj. road Id No. 356463011 (salvage Cost Tk.166578.00)
13 Jun 2024
Bangladesh Improvement Of Kasrupur Bazar Gc-balaganj Gc Rd.- Hamaspur Gps Road Rcc Road From Ch.00-218m Under Balaganj Dist.: Sylhet (road Id:691085363)
27 Jun 2024
Bangladesh Periodic Maintenance Programe For Dbs Wearing Course Work From Ch. 12+550m To Ch.16+053m, Ch. 16+286m To Ch.18+000m And Ch. 21+140m To Ch. 25+450m Of Kapasia-pabur-fuldi-kaliganj Road (z-3025) Under Gazipur Road Division During The Year 2023-2024.
Estimated Cost :2700000 BDT
27 Jun 2024
Bangladesh Renovation Of Guide Wall And Hbb Road Construction At The Proposed Secretariat Campus Ground
Estimated Cost :70000 BDT
13 Jun 2024
Bangladesh Periodic Maintenance Programe For Double Bituminous Surface Treatment (dbst)work At Ch. 13+500m To 22+500m, Ch. 24+000m To 27+000m & Ch. 31+300m To 34+800m Of Mawna-sreepur-gosingha-kapasia-aral-sanmania-hatirdia Road (r-313) Under Gazipur Road Division D
Estimated Cost :1800000 BDT
27 Jun 2024
Bangladesh Installation Floor Tiles And Construction Of 1 No New Bathroom With Ancillary Repair Works Inside The Room Sub-assistant Engineer(section-3) Office Of The Rail-way Dirversion Sub-division Office Dhaka Financial Year 2023-2024
Estimated Cost :6000 BDT
11 Jun 2024
Bangladesh Installation Floor Tiles And Construction Of 1 No New Bathroom With Ancillary Repair Works Inside The Room Sub-assistant Engineer(section-1) Office Of The Rail-way Dirversion Sub-division Office Dhaka Financial Year 2023-2024
Estimated Cost :6000 BDT
11 Jun 2024
Bangladesh Improvement Of Molomgong Bazar-jamuna River Ferry Ghat Via Sasaria Bari Road At Ch:150-700m.road Part Construction Of Rcc Box Culvert & U-drain 1) Construction Of 1nos 2x4.50x4.00m Rcc Box Culvert Ch:680m Under Upazila: Islampur, District: Jamalpur. [ Roa
Estimated Cost :300000 BDT
26 Jun 2024