Tenderskhoj
Bangladesh
- Infrastructure Roads and Highways
LOCATION SUMMARY DEADLINE
Bangladesh At Pht (north Ambagan) : Repairs And Raising To Damaged Carpeting Road Leading From Ambagan Lc Gate To Ek/41 And Connecting To Quarter No.t/511 And Dsr/16 At North Ambagan Colony Including Repairs Guide Wall With Others Allied Works.
Estimated Cost :127000 BDT
09 Jul 2024
Bangladesh At Pht (segun Bagan) : Repairs To Damaged Carpeting Road Leading From Segun Bagan Sub-station To Segunbagan Main Road Near F/4 Bunglow And Connecting To Bunglow No. F/2 & F/2, Ssae/w.w/colony/pht Office And Bunglow No.l/129, Bunglow No.l/3, Bunglow No.f/4
Estimated Cost :130000 BDT
10 Jul 2024
Bangladesh Preparatory Survey For Chattogram-cox's Bazar Main Road Improvement Project (phase 2) In Bangladesh
03 Jul 2024
Bangladesh Proof Engineering Work For The Preparatory Survey For The Chattogram-cox's Bazar Highway Improvement Project (phase 2) In Bangladesh (domestic Work)
03 Jul 2024
Bangladesh Pro/nil/dim/vr/23-24/w-490 a) Improvement Of South Singhara -kalir Danga Road At Ch-00-2175m (road Part) b) Rcc Box Culvert & U- Drain 1) Construction Of 4 Nos 0.625x0.600m U-drain At Ch -307m, 638m, 885m, & 1900m 2) Construction Of 2 Nos 1.50mx1.50m Rcc
Estimated Cost :600000 BDT
22 Jul 2024
Bangladesh Utmidp-kuri/fulb/wr-501 improvement Of Upazila Parishad Internal Road By Bc Under Fulbari Upazila, Dristrict: Kurigram. (effective Length-570.00m)
Estimated Cost :80000 BDT
14 Jul 2024
Bangladesh Maintenance Of Road By Over Layer And Bc Work And Construction Of Rcc Drain From Changtary Madrasha To H/o Montaz Ch 00-152 M Ward No-051/b(earth Filling)maintanance Of Road By Over Layer And Bc Work And Construction Of Rcc Drain From Changtary Madrasha T
Estimated Cost :90000 BDT
08 Jul 2024
Bangladesh Major Maintenance Of Azmirigonj Urc
Estimated Cost :36000 BDT
10 Jul 2024
Bangladesh Construction Of Fulchari Permeable/top Blocked Permeable Groin (4 Nos. With 2 Rows Each And 1 No. With 3 Rows) With Riverbank Protective Work 5 No. Top-blocked Permeable Groins In Series Including River Bank Protection On The Right Bank Of The Jamuna At F
18 Sep 2024
Bangladesh Widening & Strengthening Of Gazaria Gc- Char Minaka Rhd Via Dularhat Anjurhat Road (charfassin Part) Road At Ch. 13236-22009m & 532.00m Rcc Road Including 03 Nos. 2.00mx2.00m Rcc Box Culvert At 13306m, 14891m & 15879m And 04 Nos. 1.50mx1.50m Rcc Box Culve
Estimated Cost :4785000 BDT
16 Jul 2024