Tenderskhoj
Bangladesh
- Water and Sanitation
LOCATION SUMMARY DEADLINE
Bangladesh 1)construction Of Rcc Drain Starting From Bolashpur Jomsher Morol House To Vatikashor Rail Gate Via Abdul Awal Minto House In Ward No-19 (length=790m) 2) Upgrading Of Uni-block Road Starting From Bolashpur Jomsher Morol House To Abdul Awal Minto House In
07 Oct 2024
Bangladesh Pswsc-3118 Installation Of 108 Nos Shallow Tube Well (100mmx38mm) With Submersible Pump (housing 24m) At Kahaloo Upazila, Bogura In Safe Water Supply Through Out The Country Project Under Department Of Public Health Engineering, Bogura During Fy-2024-2025
Estimated Cost :300000
03 Oct 2024
Bangladesh Pswsc-3116 Installation Of 72 Nos Shallow Tube Well (100mmx38mm) With Submersible Pump (housing 24 M) At Shibganj Upazila, Bogura In Safe Water Supply Through Out The Country Project Under Department Of Public Health Engineering, Bogura During Fy-2024-202
Estimated Cost :200000
02 Oct 2024
Bangladesh Installation Of 179 Nos. Water Purifier/filter With Fittings And Fixing At Water Points With Excessive Arsenic At Tangail District Under Pswsc Project Of Dphe
Estimated Cost :150000
02 Oct 2024
Bangladesh Rehabilitation & Strengthening Of Both Dyke Of T1s2d (2.470 Km), T2s2d (0.683 Km), T3s2d (3.010 Km) & T4s2d (2.440 Km) Irrigation Canal, Total Length= 8.603 Km At Upazila- Nilphamari Sadar, District-nilphamari In C/w "rehabilitation And Extension Of Comma
Estimated Cost :116905000
16 Oct 2024
Bangladesh Pswsc-3107 Installation Of 72 Nos Shallow Tube Well (100mmx38mm) With Submersible Pump (housing 24m) At Shibganj Upazila, Bogura In Safe Water Supply Through Out The Country Project Under Department Of Public Health Engineering, Bogura During Fy-2024-2025
Estimated Cost :200000
02 Oct 2024
Bangladesh Pswsc-3116 Installation Of 72 Nos Shallow Tube Well (100mmx38mm) With Submersible Pump (housing 24 M) At Shibganj Upazila, Bogura In Safe Water Supply Through Out The Country Project Under Department Of Public Health Engineering, Bogura During Fy-2024-202
Estimated Cost :200000
02 Oct 2024
Bangladesh River Bank Protective Work Along Right Bank Of Flood Control Embankment Of Dharla River From Km 33.240 To Km 33.540 = 300.00 M At Suverkuti Area In Union Holokhana, Upazilla: Kurigram Sadar, Dist: Kurigram.
Estimated Cost :77500000
15 Oct 2024
Bangladesh River Bank Protective Work Along Right Bank Of Flood Control Embankment Of Dharla River From Km 32.940 To Km 33.240 = 300.00 M At Suverkuti Area In Union Holokhana, Upazilla: Kurigram Sadar, Dist: Kurigram.
Estimated Cost :76000000
15 Oct 2024
Bangladesh River Bank Protective Work Along Right Bank Of Flood Control Embankment Of Dharla River From Km 32.640 To Km 32.940 = 300.00 M At Suverkuti Area In Union Holokhana, Upazilla: Kurigram Sadar, Dist: Kurigram.
Estimated Cost :85000000
15 Oct 2024