Tenderskhoj
Bangladesh
- Water and Sanitation
LOCATION SUMMARY DEADLINE
Bangladesh Water Supply Engineer (water Supply System)
04 Jun 2024
Bangladesh Egp/zps/local/otm/w20 (1)sinking Of Tube Well For Drinking Water Supply At Different Open Place, Under Sunamganj District. (2) Construction Of Mujib Park Protection Work With Bench, Under Sadar Upazila, Dist: Sunamganj. (3) Improvement Of Mollikpur Park,
Estimated Cost :505000 BDT
20 Jun 2024
Bangladesh Renovation Of Sewerage Lines In Wards 16-28, Outdoor And Administrative Building Of Rajshahi Medical College Hospital.
Estimated Cost :25000 BDT
09 Jun 2024
Bangladesh Civil, Sanitary And Water Supply Line Repair Works Including Toilet Repair Of 3 Unit Quarter Of 1000 Sq. Ft. 5-c Building In The Residential Area Of Khulna Medical College
Estimated Cost :7500 BDT
09 Jun 2024
Bangladesh Brick Soling Work In Front Of Mural And Shaheed Minar Along With Repair Works Of Sewerage Line Of Anatomy Dept Of Khulna Medical College, Khulna.
Estimated Cost :7500 BDT
09 Jun 2024
Bangladesh Renovation Works For Office Of The Project Director, Water Supply Project In Coastal Areas Through Rain Water Harvesting System At Dphe Bhaban (6th Floor), Kakrail, Dhaka.
Estimated Cost :55000 BDT
13 Jun 2024
Bangladesh Renovation Of Old Water Pipeline And Other Ancillary Repair Works Civil Surgeon~s Residence, Narsingdi. Fy 2023-24
Estimated Cost :20000 BDT
12 Jun 2024
Bangladesh Hiring Charge Of 24 Nos Rain Gauge Reader, Hiring Charge Of 02 Nos Rain Gauge & Evaporation Reader, Water Sample Collection For Salinity 19 Nos Station, Sediment Collection 3 Nos Station, Collection Of 10 Nos Station Of Emergency Flood Period Data Collect
Estimated Cost :25000 BDT
13 Jun 2024
Bangladesh Installation Deep Tubewell And Civil Sanitary Repair Works Of Inland Navigation Forecasting And Warning Centerre At Ashuganj, Brahmanbaria. Fy 2023-24
Estimated Cost :15000 BDT
09 Jun 2024
Bangladesh Changing Of Water Tank And Water Supply Line Repair Works At Kabi Begum Sufia Kamal Student Hostel Of Khulna Medical College.
Estimated Cost :7500 BDT
09 Jun 2024