Tenderskhoj
Bangladesh
- Water and Sanitation
LOCATION SUMMARY DEADLINE
Bangladesh Construction Of The Soak Well And Pit Slab Cover, Repair Of The Reservoir And Roof Of The Guard Room, And Installation Of A New Door At Bkb, Uttara Dormitory, Uttara, Dhaka
30 Jun 2024
Bangladesh Renovation Works Of Water Line Meherpur 250 Beded Hospital At Meherpur.
Estimated Cost :7500 BDT
23 Jun 2024
Bangladesh Construction Of Drain At Uno Quarter And Upazila Parishad Gazetted Quarter; Maintenance Of Uno Quarter And Upazila Parishad Gazetted Quarter Under Banaripara Upazila, Barishal.
Estimated Cost :100000 BDT
23 Jun 2024
Bangladesh Scrdp-mo-u-dr3 const. Of Rcc Drain At Kutubjom Union (ch 0+025 Km To Ch. 0+960 Km) Under Moheshkhali Upazila, Cox~s Bazar. (re-tender)
Estimated Cost :700000 BDT
04 Jul 2024
Bangladesh Utmidp-cumi/lalm/wd-287 Part-a: Construction Of Rcc Drain On Dakatiya River To West Ashwatola Mandir From Ch. 00-252m Under Lalmai Upazila, District: Cumilla. Part-b: Construction Of Rcc Drain On Bagmara Jamidar Bari To Ashkamta-dhatatia Khul Mandir From
Estimated Cost :227000 BDT
08 Jul 2024
Bangladesh Installation Of 50 Nos. Deep Tube Well With No. 06 Handpump & Raised Platform, 3 Nos. Community Based Water Supply Unit At Rangabali, Galachipa & Kalapara Upazila And 250 Nos. Rain Water Hervesting System At Kalapara Upazilla In Patuakhali District.
Estimated Cost :200000 BDT
23 Jun 2024
Bangladesh Precautionary Bank Protection Work On The Right Bank Of The Mohanonda River From Km 74.710 To Km 74.781 = 71.00 M At Babupur In Gomostapur Upazila Of Chapainawabganj District In C/w "jhanjhani-holdigachi Sub-project" Under Nawabganj O&m Division, Bwdb, Ch
Estimated Cost :170000 BDT
01 Jul 2024
Bangladesh Installation Of 1 No 50mm Dia Observation Tubewell In Mymensingh District Under The Project Of Safe Water Supply Throughout The Country (all The Items Include Vat, Ait & Profit). It Is To Be Noted That The Tenderer Quoted Rate Mast Be Range Of 10 Less To
Estimated Cost :3500 BDT
27 Jun 2024
Bangladesh Supplying Of Chemical (alum) For Kuituk Water Treatment Plant.
Estimated Cost :90000 BDT
01 Jul 2024
Bangladesh Procurement Expert (pe) (s10) Of Jamuna Rier Sustainable Management Project-i (navigational Channel Development)
04 Jul 2024