Tenderskhoj
Bangladesh
- Industry Machinery
LOCATION SUMMARY DEADLINE
Bangladesh Installation Of Reverse Osmosis(ro) Type Arsenic, Iron And Salinity Removal Plant (aisru) With Existing Tube-well Total 35 Nos At Morelgonj(15 Nos), Sharankhola(10 Nos) And Mongla(10 Nos.) And Repair & Rehabilitation Of Community Based Reverse Osmosis Pla
Estimated Cost :52000 BDT
08 Jul 2024
Bangladesh Works For Yearly ( Fy 2024-25 ) Regular Maintenance Of Submersible Pump And Motor Installed At Different Deep Tube Wells Under Mod-1, Cwasa,chattogram.
Estimated Cost :607450 BDT
14 Jul 2024
Bangladesh Procurement Of Window And Split Type Ac Spare Parts Under The Boiler Maintenance Division Of Apscl.
Estimated Cost :18000 BDT
16 Jul 2024
Bangladesh Supplying Of The Following Sanitary Items: (i) Lever Pillar Cock (ii) Various Size Bone Plug (iii) Commode Seat Cover Cotto Brand (iv) Urinal Flash Valve (v) Lever Type Wc Flashing Unit Cotto Metal (vi) Basin Magic Pipe (vii) Sink Magic Pipe (viii) Metal
27 Jun 2024
Bangladesh Cover, Cylinder (port & Stbd) & Head, Cylinder (port & Stbd) (04 L/i) - Bns Joyjatra
16 Jul 2024
Bangladesh Supply Of Different Size & Color Offset Paper
Estimated Cost :5000000 BDT
24 Dec 2024
Bangladesh Supply Of Offset Printing Press Materials And Others
Estimated Cost :5000000 BDT
27 Aug 2024
Bangladesh Yearly Operation Of Window And Split Type Air Coolers Of Judicial Administrative Training Institute At 15 College Road, Sarkari Karmochari Hospital, Pwd Division At 15 College Road, 14 Abdul Goni Road And Administrative Tribunal, Dhaka (period :- 01/07/20
Estimated Cost :1161480 BDT
30 Jun 2024
Bangladesh Yearly Operation And Maintenance Of Split/window Type Air Cooler In Dhaka Medical College, Dhaka (period :- 01/07//2024 To 30/06/2025 = 12 Months).
Estimated Cost :1146972 BDT
30 Jun 2024
Bangladesh Yearly Operation, Maintenance And Servicing Of 40 H.p 02 Nos. And 50 H.p 03 Nos Centrifugal Pump Motor For 10 Storied Building Water Supply In Dhaka Medical College Hospital-2, Dhaka (period :- 01/07/2024 To 30/06/2025 = 12 Months).
Estimated Cost :298176 BDT
27 Jun 2024