Tenderskhoj
Bangladesh
- Infrastructure Roads and Highways
LOCATION SUMMARY DEADLINE
Bangladesh Maintenance Of Road By Over Layer And Bc Work And Construction Of Rcc Drain From Changtary Madrasha To H/o Montaz Ch 00-152 M Ward No-051/b(earth Filling)maintanance Of Road By Over Layer And Bc Work And Construction Of Rcc Drain From Changtary Madrasha T
Estimated Cost :90000 BDT
08 Jul 2024
Bangladesh Major Maintenance Of Azmirigonj Urc
Estimated Cost :36000 BDT
10 Jul 2024
Bangladesh Construction Of Fulchari Permeable/top Blocked Permeable Groin (4 Nos. With 2 Rows Each And 1 No. With 3 Rows) With Riverbank Protective Work 5 No. Top-blocked Permeable Groins In Series Including River Bank Protection On The Right Bank Of The Jamuna At F
18 Sep 2024
Bangladesh Widening & Strengthening Of Gazaria Gc- Char Minaka Rhd Via Dularhat Anjurhat Road (charfassin Part) Road At Ch. 13236-22009m & 532.00m Rcc Road Including 03 Nos. 2.00mx2.00m Rcc Box Culvert At 13306m, 14891m & 15879m And 04 Nos. 1.50mx1.50m Rcc Box Culve
Estimated Cost :4785000 BDT
16 Jul 2024
Bangladesh Widening & Strengthening Of Gazaria Gc- Char Minaka Rhd Via Dularhat Anjurhat Road (charfassin Part) Road At Ch. 24350-31468m & 298.00m Rcc Road Including 01 No. 2.00mx2.00m Rcc Box Culvert At 29529m And 02 Nos. 1.50mx1.50m Rcc Box Culvert At 26966m & 290
Estimated Cost :3710000 BDT
16 Jul 2024
Bangladesh Uniblock Of West Chhagalnaiya Sorkar Bari (shadak Hossain Road) Road Starting Form Abadur Razzak Road Towards Cm Road Ch.00-1205 M,link2 Mozamuder House Ch.00-728m, At West Chhagalnaiya,ward No 05,under Chhagalnaiya Pourashava, Feni.
04 Jul 2024
Bangladesh Improvement Of South Singhara –kalir Danga Road At Ch.00m To 2175m.
16 Jul 2024
Bangladesh Construction Of 2-storied Rural Market Building (with 04-storied foundation) At Goborchapa Hat, Under Upazila: Badalgachi, district: Naogaon
11 Jul 2024
Bangladesh Improvement Of Baliadanga Sarbajanin Debaloy Mondir Under keshabpur Union. [latitude: 22.899592; Longitude: 88.23248] Under keshabpur Upazila District Jashore.
27 Jun 2024
Bangladesh Improvement Of Balla U.p. Land Office Pond-1 Under Horirampur upazila. District: Manikganj .(area=0.938 Acre) (b) Construction Of 01 no. Ghatla Of 18.25 M X 4.00 M X 6.00 M At Balla U.p. Land Office pond-1
04 Jul 2024