Tenderskhoj
Azerbaijan
- Infrastructure Building
LOCATION SUMMARY DEADLINE
Azerbaijan Create The Social Protection Module Of The Labour Market Information Platform W
24 May 2024
Azerbaijan Construction Of The Administrative Building Of The New Electric Grid And 110/35/10 Kv 2x25 Mva Substation "kurdamir" In The Territory Of Kurdamir Region, Connection With The Existing Network (transfer Of Input-output Lines To The New Substation)
10 Jun 2024
Azerbaijan Preparation Of Detail Design And Construction Works For The Rehabilitation Of 13 Ranger And 2 Cordon Houses And The Reconstruction Of The Administrative Building Of Zakatala State Nature Reserve.
05 Jun 2024
Azerbaijan Construction Of A New 2-story Administrative Building Located At H. Aslanov 50, Lankaran State University.
23 May 2024
Azerbaijan Major Renovation Of The Academic Building Of Sumgayit State University.
16 May 2024
Azerbaijan Construction Of A Doctor%s Office In The Shukurbeyli Rural Settlement Of Jabrayil District With 1042 Families (635 Families In The First Stage).
02 May 2024
Azerbaijan Construction Of An Administrative Building In The Shukurbeyli Rural Settlement Of Jabrayil District With 1042 Families (635 Families In The First Stage).
02 May 2024
Azerbaijan Major Repair And Reconstruction Of The Sumgayit City Emergency Medical Hospital Building, Its Auxiliary Buildings, As Well As The Preparation Of Project-estimate Documents Related To The Landscaping And Construction Works Of The Vital Area, And The Author
01 May 2024
Azerbaijan Construction Of A Music School In The Shukurbeyli Rural Settlement Of Jabrayil District With 1042 Families (635 Families In The First Stage).
08 May 2024
Azerbaijan Construction Of A Secondary School With 360 Students In Shukurbeyli Village Of Jabrayil District With 1042 Families (635 Families In The First Stage).
02 May 2024