MP Tenders | MP Tenders Gov | Madhya Pradesh Tenders
Madhya Pradesh government tenders
- IT Software


LOCATION SUMMARY DEADLINE
Madhya Pradesh Annual Maintenance Contract (amc) For Scada Part-b 11kv Line Equipments Namely Auto Reclosure, Sectionalizer, 2/3/4 Way Rmus And Their Associated Parts I.e. End Terminal Heat Shrinkable Jointing Kit With Lugs Installed Under Mppkvvcl, Jabalpur
Estimated Cost :11758000
22 May 2024
Madhya Pradesh Providing Of Scanning Digitisation Service (version 2) - 200; A4 Legal Qty : 1000000
Estimated Cost :250000 INR
13 Jun 2024
Madhya Pradesh Supply Of Customised Chemical Detector Evaluation Test Platforms (q3)
Qty : 4

15 May 2024
Madhya Pradesh Providing Of Warehousing Service - Food Grain Storage In Rewa Revenue District On Lease With Services; As Per Mtf; Godown With Services (preservation, Insurance, Watch Ward); Hardware Software By The Service Provider Qty : 1
23 May 2024
Madhya Pradesh Supply Of Siemens Plc Hmi Screen With Accessories As Per Description In Atc Annexure 1 Attached Qty : 1
23 May 2024
Madhya Pradesh Procurement Of Server.
06 Jun 2024
Madhya Pradesh Supply, Installation, Testing, Commissioning Annual Maintenance Contract (03 Years) Of 4 Nos S Qty : 1 - Tank Farm Automation System (field & Control Room Instrumentation For The Lpg Storage).
28 May 2024
Madhya Pradesh Annual Maintenance Contract Charges For Terminal Automation System Including Spares And Positioning Of Resident Engineer At The Location. Qty : 1
Estimated Cost :18854284 INR
21 May 2024
Madhya Pradesh Supply Of Thermal Imaging Camera
Thermal Imaging Camera As Per Rdso Specification No. Ti/spc/ohe/tips/1031 (12/2013) Rev 1 (annexure-a) Or Latest As Per Model No. Flk-ti401 Pro 9 Hz ) Or Similar With Software With All Accessories [ Warranty Period:

13 Jun 2024
Madhya Pradesh Supply, Testing & Commissioning Of Cmri (common Meter Reading Instrument) Compatible With Abt Meter Specification With Standard Accessories (including Optical Probe) And Carrying Case With Necessary Demonstration As Per In-charge (material Shall Be Suppli
27 May 2024