Kerala Tenders | Kerala pwd Tenders | Kerala Govt Tenders
Kerala government tenders
- Infrastructure Bridges


LOCATION SUMMARY DEADLINE
Kerala Ers - Allp - Kyj Section -proposed Closure Of Bridge No.eak 209 By Diverting Flow Via Drain Through Bridge No. Eak 210
Estimated Cost :18505729 INR
20 May 2024
Kerala Construction Of Zoological Park At Puthur.
Construction Of Artificial Roack Stream And Tanks, Closing Of Existing Fence In Lion Exhibit And Steel Bridge In Gharial Exhibit.

Estimated Cost :3493273 INR
02 May 2024
Kerala Ernakulam - Alappuzha - Kayankulam Section - Construction of Proposed Road Over Bridge in lieu of LC No. 115 (Thrippakudam Gate) at Rly Km 85/000-100 b/w Ambalappuzha and Harippad stations of Trivandrum Division (7.50m Two lane carriageway, 1x36m + 1x18m eff. Composite Girder for Railway spans and 1
07 May 2024
Kerala Podanur - Shoranur Section - Construction of Proposed Road Over Bridge in lieu of LC No. 164 (Mankara Gate) at Rly Km 549/100-200 b/w Parli and Mankara stations of Palakkad Division (7.50m Two lane carriageway, 1x36m + 1x18m eff. span Composite Girder for Railway spans and 11x25m PSC Girder for Appr
07 May 2024
Kerala Tvc Division - Proposed Replacement Of Existing Steel Girders With Psc Slab For Br. No. 128 Up (1x 12.20m) And Br.no.136 Up (1x 12.20m) In Ers-ktym-kyj Section .
Estimated Cost :13652755 INR
09 May 2024
Kerala Aden Kollam Subdivision- Kollam P.way Section - Maintenance And Repairs Of Minor Bridges Including Clearing Of Waterway And Approach Drains.
Estimated Cost :7702089 INR
09 May 2024
Kerala Engaging consultant for preparation of dpr for 36 road over bridge across kerala -package b(12 robs)
30 Apr 2024
Kerala Engaging Consultant for Preparation of Dpr for 36 Road Over Bridges Across Kerala-package C(12 Robs)
30 Apr 2024
Kerala Engaging consultant for preparation of dpr for 36 road over bridges across kerala-package a(12 robs)
30 Apr 2024
Kerala Shoranur Mangalore Central Section - Proposed Construction Of Lakhs Months Limited Use Subway (lu S Vadakumbad) Proposed Balance Works Including Completion Of Subway Approaches, Protective Works & Other Miscellaneous Works At Kin 652/500- 600 Between Kada
Estimated Cost :8054000 INR
29 Apr 2024